Laserfiche WebLink
ENVIRONMENTAL HEALTH'DEPARTMENT <br /> SAN JOAQUIN COUNTY <br /> Unit Supervisors <br /> c. Z4 Donna K.Heran,R.E.H.S. 304 Bor R.E.H.S. <br /> m_ '� Director 304 East Weber Avenue, Third Floor <br /> Al Olsen,R.E.H.S. Stockton, California 95202.2708 Mike Huggins,R.E.H.S.,R.D.I. <br /> •c •p' <br /> ProgramMana er Douglas W.Wilson,R.E.H.S. <br /> '4coaN� Laurie uila,Man RE.H.S. Telephone: (209)468-3420 Margaret Lagorio,R.E.H.S. <br /> Program Manager Fax: (209) 464-0138 Robert McClellan,R.E.H.S. <br /> Mark Barcellos,R.E.H.S. <br /> October 18, 2004 <br /> TO: San Joaquin County <br /> Community Development Department <br /> FROM: San Joaquin County <br /> Environmental Health Department <br /> CONTACT PERSON: Raymond Borges, Lead Senior R.E.H.S.,R.D.I. <br /> PHONE NUMBER: (209)468-3284 <br /> RE: PA-04-498 (UP),Attention: Kevin Swanson <br /> 10967 North State Rout 99 West Frontage Road,Lodi <br /> The San Joaquin County Development Title Requirements listed below have been identified as <br /> pertinent to this project. Other requirements may also apply. These requirements cannot be <br /> modified. <br /> A. Environmental Health Department requires a soil suitability study incorporating proposed <br /> staff and customer use, indicating that the area is suitable for septic tank usage. This must be <br /> performed prior to issuance of a building permit(s) (San Joaquin County Development Title, <br /> Section 9-1105.2(d)). A review fee of$186.00 must be paid at time of submittal to <br /> Environmental Health Department. <br /> The sewage disposal system shall comply with the on site sewage standards of San Joaquin <br /> County prior to approval. A percolation test that meets absorption rates of the manual of <br /> septic tank practice or E.P.A. Design Manual for onsite wastewater treatment and disposal <br /> system is required for each parcel. A permit fee of$93.00 per percolation hole is required. <br /> B. State on revised site plans the maximum number of employees and customers the sewage <br /> disposal system is being designed for. In addition, show on revised plans that the leach field <br /> area will be barricaded so it cannot be driven over, parked on, or used as a storage area. This <br /> leach field area must be used for that specific purpose only, and it cannot contain any <br /> underground utility lines (San Joaquin County Development Title, Section 9-1110.4(c)(5)). <br /> In addition, the revised site plan shall incorporate the 100% designed sewage disposal <br /> replacement area. <br /> NOTE: The existing well should be depicted in the southwest comer of property, in addition to <br /> the large freeway sign. <br /> Page 1 of 2 RRk <br />