Laserfiche WebLink
Rick Griffin <br /> COMMUNITY DEVELOPMENT <br /> PA-0600499 SA(TE) <br /> 3. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application. (The fee currently is$1,398.00 per 1,000 gross square foot of building <br /> designated as Service Commercial in the Lodi area. The fee shall be automatically adjusted July 1 of each <br /> year by the Engineering Construction Cost Index as published by the Engineering News Record.) <br /> (Resolutions 00-433) <br /> 4. The Regional Traffic Impact Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application. (The fee currently is$780.00 per 1000 gross square foot of building <br /> designated as Commercial. The fee shall be automatically adjusted July 1 of each year by the Engineering <br /> Construction Cost Index as published by the Engineering News Record.) (Resolution R-06-38) <br /> 5. The Water Supply Facilities Impact Mitigation Fee shall be required for this development. The fee is due <br /> and payable prior to issuance of the building permit. (The fee currently is$623.00 per 1,000 gross square <br /> foot of building designated as Service Commercial. The fee shall be automatically increased on January I of <br /> each year through the year 2005 at the rate of 7.66 percent.) <br /> (Development Title Section 9-818.4 and Resolutions R-91-327, R-94-185 and R-97-5) <br /> 6. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> NOTE: Any construction activity that results in the disturbance of at least one(1)acre of soil shall require a State <br /> NPDES construction permit. <br /> BD <br /> PA-0600499 TE <br />