My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006069
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
11130
>
2600 - Land Use Program
>
PA-0600287
>
SU0006069
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:58:58 PM
Creation date
9/8/2019 12:49:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006069
PE
2627
FACILITY_NAME
PA-0600287
STREET_NUMBER
11130
Direction
N
STREET_NAME
STATE ROUTE 99
City
LODI
Zip
95240
APN
05926058
ENTERED_DATE
5/31/2006 12:00:00 AM
SITE_LOCATION
11130 N HWY 99
RECEIVED_DATE
5/30/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\11130\PA-0600287\SU0006069\APPL.PDF \MIGRATIONS\N\HWY 99\11130\PA-0600287\SU0006069\CDD OK.PDF \MIGRATIONS\N\HWY 99\11130\PA-0600287\SU0006069\EH COND.PDF \MIGRATIONS\N\HWY 99\11130\PA-0600287\SU0006069\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY in, <br /> COMMUNITY DEVELOPMENT DEPARTMENT <br /> INITIAL.STUDY - <br /> FILE NO: PA-0600287 PROJECT/APPLICANT: HARVEST BIBLE CHURCH/ <br /> DELLAMONICA SNYDER <br /> PROJECT DESCRIPTION:A USE PERMIT APPLICATION FOR A NEW CHURCH WITH A <br /> MAXIMUM SEATING CAPACITY OF 1,000 PEOPLE (USE TYPE: RELIGIOUS ASSEMBLY- <br /> REGIONAL). <br /> THE CHURCH <br /> WILL BE CONSTRUCTED IN FIVE (5) PHASES OVER A TWELVE <br /> (12) YEAR PERIOD. PHASE I (BUILDING PERMITS TO BE ISSUED WITHIN EIGHTEEN <br /> MONTHS FROM THE EFFECTIVE DATE OF APPROVAL) INCLUDES THE CONSTRUCTION <br /> OF ONE 12,500 SQUARE FOOT CLASSROOM BUILDING WITH AN ASSEMBLY HALL TO <br /> SERVE 350 PEOPLE. SERVICES WILL BE HELD IN THIS BUILDING UNTIL COMPLETION OF <br /> PHASE V. PHASE II (BUILDING PERMITS TO BE ISSUED WITHIN FOUR YEARS FROM THE <br /> EFFECTIVE DATE OF APPROVAL) INCLUDES THE CONSTRUCTION OF ONE 6,000 <br /> SQUARE FOOT CLASSROOM BUILDING AND A 2,400 SQUARE FOOT MAINTENANCE <br /> BUILDING. PHASE III (BUILDING PERMITS TO BE ISSUED WITHIN SIX YEARS FROM THE <br /> EFFECTIVE DATE OF APPROVAL) INCLUDES THE CONSTRUCTION OF A 6,200 SQUARE <br /> FOOT ADMINISTRATION BUILDING. PHASE IV (BUILDING PERMITS TO BE ISSUED WITHIN <br /> NINE YEARS FROM THE EFFECTIVE DATE OF APPROVAL) INCLUDES THE <br /> CONSTRUCTION OF A 18,000 SQUARE FOOT MULTI-PURPOSE BUILDING. PHASE V <br /> (BUILDING PERMITS TO BE ISSUED WITHIN TWELVE YEARS FROM THE EFFECTIVE DATE <br /> OF APPROVAL) INCLUDES THE CONSTRUCTION OF A 34,000 SQUARE FOOT CHURCH <br /> SANCTUARY. THE PROJECT SITE IS LOCATED ALONG A 250 FOOT EASEMENT EAST OF <br /> STATE ROUTE 99 EAST FRONTAGE ROAD, 1,200 FEET NORTH OF EIGHT MILE ROAD, <br /> NORTHEAST OF STOCKTON. <br /> RECOMMENDED ENVIRONMENTAL DETERMINATION: <br /> The proposed project could not have a significant effect on the <br /> environment, and a Negative Declaration will be prepared. _ <br /> Although the proposed project could have a significant effect on the <br /> environment, there will not be a significant effect in this case because <br /> the mitigation measures described on an attached sheet have been <br /> added to the project. A Negative Declaration will be prepared. X <br /> The proposed project may have a significant effect on the environment, <br /> an Environmental Impact Report is required. <br /> ASSESSOR PARCEL NO: 059-260-58, -60, -76 ACRES: 17.08 <br /> GENERAL PLAN: AIG ZONING: AG-40 <br /> CURRENT SITE CONDITIONS (topography, uses): FLAT LAND WITH TWO EXISTING <br /> RESIDENCES AN EXISTING DETACHED GARAGE AND A SHED. <br /> POTENTIAL POPULATION, NUMBER OF DWELLING UNITS, OR SQUARE FOOTAGE OF <br /> USE(S): One 34,000 square foot church sanctuary, one 2,400 square foot maintenance building, <br /> Initial Study - 1 - Revised 5-00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.