My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006069
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
11130
>
2600 - Land Use Program
>
PA-0600287
>
SU0006069
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:58:58 PM
Creation date
9/8/2019 12:49:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006069
PE
2627
FACILITY_NAME
PA-0600287
STREET_NUMBER
11130
Direction
N
STREET_NAME
STATE ROUTE 99
City
LODI
Zip
95240
APN
05926058
ENTERED_DATE
5/31/2006 12:00:00 AM
SITE_LOCATION
11130 N HWY 99
RECEIVED_DATE
5/30/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\11130\PA-0600287\SU0006069\APPL.PDF \MIGRATIONS\N\HWY 99\11130\PA-0600287\SU0006069\CDD OK.PDF \MIGRATIONS\N\HWY 99\11130\PA-0600287\SU0006069\EH COND.PDF \MIGRATIONS\N\HWY 99\11130\PA-0600287\SU0006069\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4� <br /> n <br /> Rick Griffin 2 <br /> COMMUNITY DEVELOPMENT DEPARTMENT <br /> PA-0600287 (UP) <br /> Applioant shall pr-evi4e evidenee of the ability to aeoess the E;ite 40M Fight Mile Read- <br /> RECOMMENDATIONS: <br /> 1. For Phase I, prior to the'issuance of a building permit an encroachment permit shall be required for work within <br /> road right-of-way at the SR 99 East Frontage Road. (Development Title Sections 9-1.145.4 and 9-1145.5) <br /> 2. For Phase I, the driveway approach at the SR 99 East Frontage Road shall be improved in accordance with the <br /> requirements of San Joaquin County Standards R-17 prior to issuance of the occupancy permit. (Development <br /> Title Section 9-1145.5) <br /> 3. For Phase N, a lot line adjustment with APN 059-260-76 starting from APN 059-260-58 to Eight Mile Road <br /> which will allow for the future access road easeffie=t shall be recorded <br /> prior to issuance of the building permit. <br /> 4. For Phase IV, prior to the issuance of a building permit an encroachment permit shall be required for work within <br /> road right-of-way at the Eight Mile Road. (Development Title Sections 9-1145.4 and 9-1145.5) <br /> 5. For Phase IV, the driveway approach at the Eight Mile Road shall be improved in accordance with the <br /> requirements of San Joaquin County Standards R-17 prior to issuance of the occupancy permit. (Development <br /> Title Section 9-1145.5) <br /> 6. For Phase IV at the project driveway at Eight Mile Road, the onsite southbound shared left-right lane shall be split <br /> into separate exclusive left and right turn lanes for a minimum stacking distance of seventy-five feet from the <br /> future right-of-way( see condition #18 belowplus the distance to the current edge of pavement, and shall be <br /> shown on the site plan. The project proponents shall be responsible for 100% of the improvement. <br /> 7. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the time <br /> of each building permit application. (The fee currently is $166.00 per daily trip-end generated in the Lodi area. <br /> The fee shall be automatically adjusted July 1 of each year by the Engineering Construction Cost Index as <br /> published by the Engineering News Record. (Resolution R-00-433) <br /> 8. The Regional Transportation Impact Fee shall be required for this development. The fee is due and payable at the <br /> time of each building permit application. The fee currently is $1,430.00 per 1,000 gross square foot of building. <br /> The fee is based on the current schedule. (Resolution R-06-38) <br /> 9. The Water Supply Facilities Impact Mitigation Fee shall be required for this development. The fee is due and <br /> payable prior to issuance of each building permit. (The fee currently is $680.00 per 1,000 gross square foot of <br /> building designated as Service Commercial. The fee shall be automatically increased on January I of each year <br /> through the year 2015 at the rate of 4.55 percent. (Development Title Section 9-818.4 and Resolutions R-91-327, <br /> R-94-185 and R-97-5) <br /> i <br /> t <br />
The URL can be used to link to this page
Your browser does not support the video tag.