Laserfiche WebLink
SAN JOAQUIN. ALLEY UNIFIED AIR POLLUTIC _ CONTROL DISTRICT <br /> Compliance Assistance Bulletin- December, 1994 <br /> Asbestos Synopsis <br /> Definitions Continued <br /> Regulated Asbestos-Con raining (1) Friable asbestos-containing material (ACM). <br /> Mstena/s IRACMI Include: <br /> 121 Category 1 nonfriable ACM in poor condition and "has become friable' or that has or <br /> will be subjected to sanding, grinding, cutting, or abrading. <br /> (3) Category II nonfriable ACM that has a high probability of becoming, or as become. <br /> crumbled, pulverized, or reduced to powder by the forces expected to act on the <br /> material in the course of demolition or renovation. <br /> Friable Asbestos -Containing Any material containing more than 1 percent asbestos, as determined by Polarized Light <br /> Material(A CM). Microscopy (PLM) testing, which, when dry, can be crumbled, pulverized, or reduced to <br /> powder by hand pressure. <br /> Category I nontriab/e ACM: Any asbestos-containing packings, gaskets, resilient floor coverings, and asphalt roofing <br /> products containing more than 1 percent asbestos as determined by PLM testing. <br /> Category//nontriable ACM: Any asbestos-containing materials, excluding Category 1 ACM, containing more than 1 <br /> percent asbestos as determined by PLM testing, which when dry, cannot be crumbled. <br /> pulverized, or reduced to powder by hand pressure. <br /> Inspection:done by, or under the direction of a Cal-OSHA certified consultant prior to: <br /> • Any regulated demolition. <br /> • Any renovation activity in which more than 160 sq. h. of any building material or 260 linear feet of pope insulation will be <br /> disturbed. An inspection is not required if the material to be disturbed is stipulated to be asbestos-containing and will be <br /> removed in accordance with the NESHAP. <br /> Inspection Report Must Include: <br /> •A schematic showing the location of all tested materials. <br /> • The following data for all asbestos-containing materials: <br /> 1.The amount and description of each material. <br /> 2. Percent asbestos content. <br /> 3. Whether or not the material is friable. <br /> Notification: An asbestos notification must be submitted to the District at least 10 working days Prior to: <br /> 1. Any regulated demolition <br /> 2. Any renovation in which more than 160 sq. ft. or 260 linear ft. of RACM will be disturbed. <br /> A copy of the Asbestos Impaction Report must be included with the Notification. <br /> Notification will not be considered complete, not will the 10 working day notice period begin until all regared mfermatior. ar._ <br /> fees and fees have been submitted to the District. <br /> Fees: District Rule 3050 requires that nonrefundable asbestos fees be received along with asbestos job notifications. Fees must <br /> be paid for regulated asbestos abatement projects and regulated demolition projects, whether or not asbestos is present. <br /> Demolition Release Form: The California Health and Safety Code requires that the city or county building official have proof of <br /> compliance with, or exemption from, the asbestos notification requirement before he or she issues a demolition permit. <br /> After the District has received a demolition notification and is satisfied that the NESHAP notification requirements have been <br /> complied with, the District will issue a Demolition Release Form to the person who submitted the notification. <br /> Recycling and Waste Disposal. The asbestos notification must also identify any building materials which will be recycled after <br /> removal from a project. The name of the recycling contractor and location of such activity must be identified. <br /> For additional Information, please contact the Compliance Division of your nearest regional office: <br /> Northern Region Central Region Southern Region <br /> 4230 Kieman Avenue, Suite 130 1990 East Gettysburg Ave 2700 M Street, Suite 275 <br /> Modesto CA 95356-9321 Fresno CA 93726 Bakersfield CA 93301-2370 <br /> (209) 557-6400 (559) 230-5950 (661) 326-6900 <br /> JM hAcegaloan\asbstosl.syn <br />