Laserfiche WebLink
Kerry Sullivan -2- <br /> COMMENTS ON DEVELOPMENTS <br /> SA-01-41 <br /> currently is required for processing per Development Title Table 9-240.2 in addition to a <br /> copy of the Grant Deed and an estimate for the required frontage improvements. The <br /> estimate shall be prepared by a Registered Civil Engineer with a typical section drawing <br /> on a form to be supplied by the Department option, the Department of Public Works will <br /> prepare the drawing and estimate for an additional fee of $140.00.) (The fee due will be <br /> based on the current fee schedule.) <br /> (Development Title Section 9-1150.2) <br /> 5. The Traffic Impact Mitigation Fee will be required for this development. The fee is due <br /> and payable at the time of building permit application. (The fee currently is $410.00 per <br /> 1,000 gross square foot of building designated as warehouse in the Stockton area. The <br /> fee shall be automatically adjusted July 1 of each year by the Engineering Construction <br /> Cost Index as published by the Engineering News Record. A credit may be allowed if it <br /> can be verified that the existing development on this site was in operation on or after <br /> April 23, 1990.) <br /> (Resolution R-00-433) <br /> 6. The Water Supply Facilities Impact Mitigation Fee will be required for this development. <br /> The fee is due and payable prior to issuance of the building permit. (The fee currently is <br /> $184.00 per 1,000 gross square foot of building designated as warehouse. The fee shall <br /> be automatically increased on January 1 of each year through the year 2005 at the rate <br /> of 7.66 percent. A credit may be allowed if it can be verified that the existing <br /> development on this site was in operation on or after April 30, 1991.) <br /> (Development Title Section 9-818.4 and Resolutions R-91-327, R-94-185 and R-97-5) <br /> 7 A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 8. Verification shall be obtained from the Solid Waste Division (468-3066) that this <br /> development has met the requirements of the Waste Plan Format for Development <br /> Projects. Final Site Plan is required upon submittal of verification. <br /> 9. There appears to be conflict of driveway around the building and freeway off/on,ramp. <br /> Future property lines and set backs shall be shown properly. <br /> GK:BN:wc <br /> PS-WW2-W1C <br /> 1 cn' �e oh,si . <br />