Laserfiche WebLink
CONDITIONS OF APPROVAL <br /> SA-96-13 <br /> Quaschnick <br /> Site Approval Application No. SA-96-13 was approved by the San Joaquin County Community <br /> Development Department on April 10, 1996. The effective date of approval is April 20, 1996. This <br /> approval will expire on October 20, 1997, which is 18 months from the effective date of approval, <br /> unless (1) all Conditions of Approval have been complied with, (2) all necessary building permits <br /> have been secured and remain in force, and (3) all necessary permits from other agencies have been <br /> secured and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and Ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as Ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other Ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT: (Staff Contact: Chandler Martin, 4683190) <br /> a. BUILDING PERMIT: Submit an 'APPLICATION-COMMERCIAL BUILDING PERMIT.' The <br /> Site Plan required as a part of the building permit must be prepared by a registered civil <br /> engineer or licensed architect. This Plan must show drainage, driveway access details <br /> (including gates), on-site parking, landscaping, signs, existing and proposed utility <br /> services, and grading (refer to the'SITE PLAN CHECK LIST'for details). A fee is required <br /> for the Site Plan review. (Development Title Section 9-884) <br /> b. APPROVED USE: This approval is for 114-foot-high cellular tower and a 200-square-foot <br /> utility building as shown on the Plan submitted April 2, 1996. <br /> C. STORM DRAINAGE: Any additional storm water drainage created by new improvements <br /> shall be retained on the site. The drainage pattern and corresponding storm drain <br /> improvements shall be shown on the Site Plan. Drainage calculations prepared by a <br /> registered civil engineer or architect shall be included. <br /> 2. DEPARTMENT OF PUBLIC WORKS: (Contact Person: Tom M. Iwamiya, 4683023) <br /> a. The Traffic Impact Mitigation Fee will be required for this development. The fee is due <br /> and payable at the time of building permit application. The fee currently is $533.00 per <br /> 1,000 gross square feet of building designated as Manufacturing in the Lodi area. The <br /> fee shall be automatically adjusted July 1 of each year by the Engineering Construction <br /> Cost Index as published by the Engineering News Record. (Resolutions R-90304, R-91- <br /> 1025, R-93-167, R-94-174, and R-95-650) <br />