Laserfiche WebLink
These time limits adopted by SSJID are not in most cases equal to those utilized by the <br /> govemmental agency or institution responsible for development approvals. Should the time limit be <br /> exceeded, SSJID reserves the right to then apply any of its current development standards and <br /> requirements." <br /> Furthermore, the District reserves the right to apply additional conditions if development does not <br /> occur within one(1)year of Planning Commission's approval. <br /> 8) SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT(Staff contact: Michael Corder. x5591 <br /> 230-5818 <br /> a) The proposed project may require District permits. Prior to the start of construction the project <br /> proponent should contact the District's Small Business Assistance Office at (550) 230-5888 to <br /> determine if an Authority to Construct(ATC)is required. <br /> The proposed project may be subject to the following District rules: Regulation VIII(Fugitive PM10 <br /> Prohibitions), Rule 4102(Nuisance), Rule 4601 (Architectural Coatings),and Rule 4641 (Cutback, <br /> Slow Cure, and Emulsified Asphalt, Paving, and Maintenance Operations). <br />