Laserfiche WebLink
-2- <br /> Kerry Sullivan <br /> COMMUNITY DEVELOPMENT <br /> PA-03-121 (SA) <br /> 2. The driveway approach shall be improved in accordance with the requirements of San <br /> Joaquin County Standards R-17 prior to issuance of the occupancy permit. <br /> (Development Title Section 9-1145.5) <br /> 3. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due <br /> and payable at the time of building permit application. (The fee currently is $170.16 per <br /> additional daily trip-end generated in the Lodi area. The fee shall be automatically <br /> adjusted July 1 of each year by the Engineering Construction Cost Index as published by <br /> the Engineering News Record.) <br /> (Resolutions 00-433) <br /> 4. A copy of the Final Site Plan shall be submitted to the Department of Public Works prior <br /> to the execution of building permit release form. <br /> NOTE: Any construction activity that results in the disturbance of at least one (1) acre of soil <br /> shall require a State NPDES construction permit. <br /> DTP:DG:ar <br /> P:TONM ENTS\SAWR 2003TA-030012 Lwpd <br />