Laserfiche WebLink
COMMENTS ON DEVELOPMENTS <br /> SA-93-17 <br /> 4 . The frontage improvement for South 99 Frontage Road (west) <br /> shall be constructed in conformance with the standards for <br /> one-half of a 60-foot right-of-way rural collector road. <br /> The construction of the frontage improvements will be <br /> deferred upon execution by the owner of a Deferred Frontage <br /> and Roadway Improvement Agreement or a Secured Deferred <br /> Frontage and Roadway Improvement Agreement with a deposit <br /> equivalent to their estimated construction costs prior to <br /> approval of the Improvement Plan. (A $260. 00 fee currently is <br /> required for processing per Development Title Table 9-240 . 2 in <br /> addition to a copy of the Grant Deed and an estimate for the <br /> required frontage improvements. The estimate shall be prepared <br /> by a Registered Civil Engineer with a typical section drawing <br /> on a form to be supplied by the Public Works Department and <br /> submitted to the Public Works Department for approval. As an <br /> option the Department of Public Works will prepare the drawing <br /> and estimate for an additional fee of $115 . 00 . ) <br /> (Development Title Section 9-1150. 2) <br /> c: Manuel Lopez <br /> Deputy Director/Development <br /> 2 <br />