My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0003111
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
13979
>
2600 - Land Use Program
>
SA-93-17
>
SU0003111
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:58:48 PM
Creation date
9/8/2019 12:53:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0003111
PE
2633
FACILITY_NAME
SA-93-17
STREET_NUMBER
13979
Direction
S
STREET_NAME
STATE ROUTE 99
City
THORNTON
ENTERED_DATE
11/6/2001 12:00:00 AM
SITE_LOCATION
13979 S HWY 99
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\13979\SA-93-17\SU0003111\IMP PLN.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMMENTS ON DEVELOPMENTS <br /> SA-93-17 <br /> 4 . The frontage improvement for South 99 Frontage Road (west) <br /> shall be constructed in conformance with the standards for <br /> one-half of a 60-foot right-of-way rural collector road. <br /> The construction of the frontage improvements will be <br /> deferred upon execution by the owner of a Deferred Frontage <br /> and Roadway Improvement Agreement or a Secured Deferred <br /> Frontage and Roadway Improvement Agreement with a deposit <br /> equivalent to their estimated construction costs prior to <br /> approval of the Improvement Plan. (A $260. 00 fee currently is <br /> required for processing per Development Title Table 9-240 . 2 in <br /> addition to a copy of the Grant Deed and an estimate for the <br /> required frontage improvements. The estimate shall be prepared <br /> by a Registered Civil Engineer with a typical section drawing <br /> on a form to be supplied by the Public Works Department and <br /> submitted to the Public Works Department for approval. As an <br /> option the Department of Public Works will prepare the drawing <br /> and estimate for an additional fee of $115 . 00 . ) <br /> (Development Title Section 9-1150. 2) <br /> c: Manuel Lopez <br /> Deputy Director/Development <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.