Laserfiche WebLink
Thomas M. Gau -2- <br /> COMMENTS ON DEVELOPMENTS <br /> SA-95-01 <br /> 3 . The frontage improvements for South 99 Frontage Road shall be <br /> constructed in conformance with the standards for one-half of a <br /> 60-foot right-of-way collector road across APN 218-020-02 . <br /> (Development Title Section 9-1150 .2) <br /> 4 . The Traffic Impact Mitigation Fee will be required for this <br /> development . The fee is due and payable at the time of building <br /> permit application. If it can be verified that the site was being <br /> used within the last two years, a credit will be allowed for the <br /> previous use . (The fee currently is $216 . 12 per daily trip-end <br /> generated in the Manteca area. The fee shall be automatically <br /> adjusted July 1 of each year by the Engineering Construction Cost <br /> Index as published by the Engineering News Record. ) <br /> (Resolutions R-90-304 , R-91-1025, R-93-167 and R-94-174) <br /> TMI :RH: lt <br /> as-seieo. <br /> c : Manuel Lopez, Deputy Director/Development <br />