My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002304_SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
18621
>
2600 - Land Use Program
>
UP-96-05
>
SU0002304_SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:52:11 PM
Creation date
9/8/2019 12:54:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0002304
PE
2626
FACILITY_NAME
UP-96-05
STREET_NUMBER
18621
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
ENTERED_DATE
10/26/2001 12:00:00 AM
SITE_LOCATION
18621 N HWY 99
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\18621\UP-96-05\SU0002304\NL STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.i <br /> III. NITRATE LOADING STUDY FINDINGS <br /> A. WASTEWATER FLOW CALCULATIONS AND CHARACTERISTICS <br /> To adequately determine nitrogen loading from the proposed conventional effluent leachfield, <br /> _ wastewater flows must be determined as accurately as possible. These wastewater flow <br /> determinations are primarily based on long-term growth projections. It is anticipated the Calvary <br /> Bible Church will have meetings almost everyday of the week,with the possible exception of <br /> Saturdays. As with most Churches, Sund#6 are the heaviest flow days of the week and influence <br /> flow estimates and design criteria. The following calculations demonstrate flow projections for <br /> Phase I and Phase II: <br /> PHASE I: / <br /> 25,000 sq ft worship/education building: OJ 5/ Al <br /> Initial seating for 600; to be expanded to 990 pew seats X 80%average occupancy= 800 people <br /> 800 people X 2 Services = 1600+ 500 students in one education session=2100 people/Sunday <br /> Monday-Friday, approximately 50 people each day for 2 hr meeting= 5 days X 50=250 people <br /> Children's midweek program=250 people <br /> 2100+250+250 =2600 people/wk X 5 gals/person= 13000 gals/wk- 7 days/wk= <br /> 1857 gaWday=Average Daily Flow(ADF) <br /> PHASE H (3-5 yrs): <br /> _ 12,000 sq ft offices/classrooms building+expansion of worship center: <br /> Max 10 staff people, Monday through Friday <br /> 450 students each Sunday <br /> Monday-Friday, approximately 50 people each day for 2 hr meeting= 5 days X 50=250 people= <br /> 10+450 +250= 710 people/wk X 5 gals/person=3550 gals/wk_7 days/wk=507gals/day ADF <br /> PHASE III (Several yrs): <br /> 12,000 sq ft multi-purpose/recreation building for youth and recreation <br /> 200 people X 5 days/wk= 1000 people X 5 gals/person= 5000 gals/wk_ 7 days/wk= <br /> 720 gals/day ADF <br /> Phase III wastewater flow calculations will not be factored into the design since it is anticipated <br /> this Phase will be completely separate from Phase I and II. The septic system design for Phase <br /> III should be based upon what has transpired with the first two Phases in combination with the <br /> proposed usage at that future point in time. <br /> Therefore,the following flow rates apply: <br /> 1857 (Phase I) + 507 (Phase II) =2364 gal/day ADF <br /> In addition to conventional wastewater flows from restrooms, it is proposed to add a catering <br /> kitchen to the Church. It is our understanding this kitchen will not be for primary food <br /> preparation, but rather for the final stages of food preparation which has been brought to the <br /> 4 <br /> va[!ey Ag PPsearrh <br />
The URL can be used to link to this page
Your browser does not support the video tag.