Laserfiche WebLink
THOMAS R. FLINN P.O.BOX 1810-1810 E.HAZELTON AVENUE <br /> DIRECTOR �(+ wh STOCKTON,CALIFORNIA 95201-3018 <br /> Ria <br /> 4 (209)468-3000 FAX(209)468-2999 <br /> C, F O RHP www.co.san-joaquin.ca.us <br /> THOMAS M.GAU <br /> DEPUTY DIRECTOR :; j•' <br /> MANUEL SOLORIO Working for YOU <br /> DEPUTY DIRECTOR <br /> STEVEN WINKLER <br /> DEPUTY DIRECTOR <br /> ROGERJANES <br /> BUSINESS ADMINISTRATOR <br /> March 31, 2006 RECrIVEC <br /> MEMORANDUM APR 7 2005 <br /> TO: Raymond Hoo, Senior Planner <br /> Community Development Department O4I7 mijn4y Development Dept. <br /> CONTACT PERSON: Mo Haatteff <br /> FROM: Dean Gilman, Engineer IV �/�. <br /> Public Services Division /" <br /> SUBJECT: PA-06-035 A MINOR SUBDIVISION APPLICATION TO SUBDIVIDE AN EXISTING 8.5 <br /> ACRE PARCEL INTO TWO PARCELS. PARCEL ONE TO CONTAIN 5.0 ACRES FOR <br /> FINANCING PURPOSES. PARCEL TWO TO CONTAIN 3.5 ACRES,LOCATED ON THE <br /> WEST SIDE OF STATE ROUTE 99 WEST FRONTAGE ROAD, 2,317 FEET SOUTH OF <br /> WOODBRIDGE ROAD. (SUPERVISORIAL DISTRICT 4) <br /> PROPERTY OWNER: Indarjith Kor APPLICANT: Monte K. Seibel <br /> ADDRESS: 18767 N. State Highway Route 99 W. Frontage Rd APN: 013-220-18 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated Flood Hazard Area. <br /> State Highway Route 99 W. Frontage Road has an existing and planned right-of-way width of 65 feet.. <br /> The Traffic Impact Mitigation Fee shall be required when parcels are developed. The fee is due and payable at <br /> the time of building permit application. <br /> The Regional Traffic Impact Fee will be required when parcels are developed. The fee is due and payable at the <br /> time of building permit application. <br /> RECOMMENDATIONS: <br /> 1. A Parcel Map is required. (Development Title Section 9-915.2) <br /> 2. All easements of record shall be shown on the Parcel Map. (Development Title Section 9-910.20) <br /> Note: Any construction activity that results in the disturbance of at least one (1) acre of soil shall require a <br /> State NPDES construction permit. <br /> r��.cu..,.. <br />