Laserfiche WebLink
1',AY-11-2007 15:56 FROM:SMI 9 931-2373 -9:4640138 P.2 <br /> This Addendum, dated May 11, 2007,corrects a calculation made under Procedure 3. <br /> Correction: The rapid perc test results should be corrected to read less than 5 min/inch for both <br /> parcels. The leach field should contain 6,000 SF min for each parcel. (Par 1 and Par 2) <br /> End of correction. <br /> p �ESY F, s�✓q�'',� <br /> No. 12 <br /> Exg 3-31-09 <br /> 1. <br />