Laserfiche WebLink
oPq.0N C, <br /> COUNTY OF SAN JOAQUIN THOMAS R.FLINN <br /> Q= <br /> DEPARTMENT OF PUBLIC WORKS DEPUTY DIRECTOR <br /> P.O.BOX 1810- 1810 EAST HAZELTON AVENUE MANUEL LOPEZ <br /> STOCKTON,CALIFORNIA 95201-1810 DEPUTY DIRECTOR <br /> 209/468-3000 STEVEN WINKLER <br /> FAX:209/468-2999 DEPUTY DIRECTOR <br /> HENRY M. HIRATA <br /> DIRECTOR <br /> November 24, 1999 <br /> MEMORANDUM v N0I/< 3 a <br /> TO: Thomas M. Gau, Senior Civil Engineer <br /> Community Development Department <br /> CONTACT PERSON: Jeff Fisher <br /> FROM: Gabriel Karam, Senior Civil Engineer G K <br /> Public Services Division <br /> SUBJECT: SA-99-86 A SITE APPROVAL APPLICATION TO EXPAND AN EXISTING <br /> PRIVATE SCHOOL BY ADDING A 2,880-SQUARE-FOOT BUILDING TO BE <br /> USED AS TWO CLASSROOMS, RESTROOMS AND TEACHER'S PREP <br /> ROOM, LOCATED ON THE EAST SIDE ON NORTH 99 FRONTAGE ROAD <br /> EAST, 725 FEET NORTH OF CLARKSDALE ROAD, EAST OF LODI. <br /> (DISTRICT 4). <br /> APPLICANT: May Road Investment Company, LLC APN: 017-090-52 <br /> INFORMATION: <br /> The site not currently located within a Federal Flood Insurance Administration Designated Flood <br /> Hazard Area. North 99 Frontage Road East has an existing right-of-way width of 56 feet and a <br /> planned right-of-way width of 56 feet. <br /> RECOMMENDATIONS: <br /> 1. Encroachment permit shall be required for work within road right-of-way. <br /> (Development Title Sections 9-1145.4 and 9-1145.5) <br /> 2. The driveway approach, unless already paved, in accordance with the requirements of <br /> San Joaquin County Standards R-17 Prior to issuance of the occupancy permit. <br /> (Development Title Section 9-1145.5) <br /> 3. The Traffic Impact Mitigation Fee will be required for this development. The fee is due <br /> and payable at the time of building permit application. (The fee currently is $1,499 <br /> per 1,000 gross square foot of building as office in the Lodi area. The fee shall be <br /> automatically adjusted July 1 of each year by the Engineering Construction Cost Index as <br /> published by the Engineering News Record. A credit may be allowed if it can be verified <br /> that the existing development on this site was in operation on or after April 23, 1990. <br /> (Resolutions R-90-304, R-91-1025, R-93-167, R-94-179, R-95-650 and R-96-592) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building peril-lit. <br /> GK:RH:af <br /> PS-9K121-A1C <br /> E: Manuel Lopez, Deputy Director/Development <br />