Laserfiche WebLink
i <br /> i <br /> E <br /> MONITORING AND REPORTINfs eROGRAM NO.R5-2003-0099 4 <br /> NEWPORT PACIFIC CAPITAL COMPANY,INC <br /> ARBOR MOBILE HOME PARK WASTEWATER TREATMENT FACIILTY <br /> SAN JOAQUIN COUNTY <br /> i. rl.��aprrati��e deo�rip tion of all pruF2.'�2.tvey,amonatv�'aaag,sampling,—.vwed aaTi .J tireµ rung�iCi iiGies <br /> for the groundwater monitoring. The narrative shall be sufficiently detailed to verify <br /> compliance with the WDR,this MRP; and the Standard Provisions and Reporting <br /> Requirements. The narrative shall be supported by field logs for each well documenting depth <br /> to groundwater;parameters measured before, during, and after purging;method of purging; <br /> calculation of casing volume; and total volume of water purged; <br /> I +_'rucul auon of groundwater elevations,du.assessxizent Cif grv►indwater aa <br /> soW ULLC��x�ax nd <br /> gradient on the date of measurement, comparison of previous flow direction and gradient data, <br /> and a discussion of seasonal trends if any; <br /> 4. A narrative discussion of the analytical results for all groundwater locations monitored <br /> including spatial and temporal tends,with reference to summary data tables, graphs, and <br /> appended analytical reports(as applicable); <br /> 5. A comparison of the monitoring data to the groundwater limitations and an explanation of any <br /> violation of those requirements; <br /> . m„ma_ry data tables of historical and current water table elevations and analytical results; <br /> 7. A scaled map showing relevant structures and features of the facility,the locations of <br /> monitoring wells and any other sampling stations,and groundwater elevation contours <br /> referenced to mean sea level da-LUm; and <br /> 8. Copies of laboratory analytical report(s)for groundwater monitoring. <br /> C. Annual Report <br /> An Annual Report shall be prepared as the fUurth quarter monitoring report. The Annual Report will <br /> include all monitoring data required iu the moi d—dy/quarte'rl-y skaueuulZ. 'tut�r4u1u41.R%;po'.t short VU <br /> submitted to the Regional Board by 1 February each year. In addition to the data normally presented, <br /> tlae Annual Report shall include the following: <br /> 1. The contents of the regular quarterly monitoring report for the last quarter of the year;- <br /> 2. <br /> ear;2. Zf requested by staff,tabular and grapl�aical summaries of all data collected during the year; <br /> 3. Results of effluent and groundwater annual mon:itoririg; <br /> 4. A description of any activity to control vegetation in the leachfield area; <br /> 5. A,statement of w hen the O ilei Manual was last reviewed.for adeg7aacy, and a descrip ioJLA of <br /> any changes made during the year; <br /> b. A summary of maintenance and repairs activities which were performed on the collection <br /> • system; and <br /> 7. A discussion of any compliance and the corrective actions taken, as well as any planned or <br /> proposed actions needed to bring the discharge into full compliance with the waste discharge <br /> requirements. <br />