Laserfiche WebLink
App�icatjon ft,__fA, 600194 <br /> SITE PLAN CEIVEj-) <br /> .k <br /> FEBRUARY, 2017 MAR 64 <br /> __._._....._._.... <br /> ._____ <br /> SCAL _? mm 50' _n.._ ___ __._.__._..___......__.___.___�____..__ _ __..... �._ _.__.._ _ _ _.__ __ _.___..____ __ <br /> _ _� RIGOBRTO GAMA <br /> PROPOSED SEPTIC AND2063 PROVIDENCE WAY <br /> LEACH LINE. ' 'TO P/ PROPOSED REPLACEMENT LODI, CA, 95242 <br /> L. (209) 810--46773029 AREA 10' LANDSCAPE 6 _ <br /> E3( PIP <br /> w w w w w •d 4::iJiiii::(\H}: <br /> .... ;i.....::(ir: <br /> . ___.,. ._..._. ......... ..... _...._ ........_. ._...,,_ .®..... .,.—__..._, _......... •«•.. . ..... ._....,. __—_ _^.�x..•..�s`v`^".ems"•_ .. ,...,...,.,... <br /> w STRUCTURE 1 <br /> w <br /> 0 BANK TOE <br /> LO <br /> PROPOSED FIRE <br /> 40' SUPPRESSION TANK DILLON & MURPHY <br /> 2180 <br /> ry i 847 NB� LU AVENUE, SUITE A2 <br /> ui --PROPOSED <br /> i4a U I crV) Lo _ BIO--RETENTION LORI, CA. 95241 <br /> I ; < AL334-6613 <br /> i 5 i }-5" PLANTER A/P <br /> PPRDPIATE (209) <br /> I PLANTER .P,N> 013-190-05 ( f <br /> LANDSCAPING <br /> 40' <br /> $ <br /> 65'— <br /> 1. APN, 013 -1900 <br /> 2. WATER. PROPOSED PRIVATE WELL <br /> 1 SANITARY SEWER, PROPOSED SEPTIC <br /> 4. STORM DRAINAGE: ON-SITE RETENTION POND <br /> w OPOSED, SCALE 5. SITE ADDRESS: 22420 N. 99 FRONTAGE RD, <br /> PROPOSED ACAMPO, CA, 95220 <br /> w <br /> WELL --------- EX, P 6, FLOOD ZONE. ZONE X, MAP NO. 06077CO16OF OCTOBER 16, 2009 <br /> --------- 7. STRUCTURE 1- 4.0'X35' PROPOSED OFFICE '1400 S.F. (PHASE 1), <br /> ---------- <br /> 40'X65' (PHASE 2). 4000 S.F TOTAL WITH 2 STORY MAX. <br /> 75° - ----------------- 6. STRUCTURE 2- 10'X100' PROPOSED ONE STORY, 7000 S.F. SHOP, <br /> INCLUDING A 30'X30' OFFICE 900 S.F® <br /> 630 <br /> 9. SITE ADDRESS. 22420 N. 99 FRONTAGE RD. <br /> T - 10. ONE OF THE BAY'S SHALL BE USED FOR GENERAL SERVICING OF TRUCKS. <br /> BE TR <br /> REMOVED b__ 11. EMPLOYEE'S SHALL PARK THEIR PERSONAL VEHICLE IN TIME S <br /> 3 AME SPOT <br /> w THEY PULL THE TRUCK OUT FROM. <br /> 551 w � 4 ' <br /> 12, THERE ARE 63 PROPOSED TRUCK PARKING SPOTS. <br /> 13. THE PROJECT SITE SLOPES SOUTH EAST CONFORMING TO STATE <br /> w GNASH DAY HIGHWAY 99 AND N 99 FRONTAGE RD, <br /> 14. EXISTING TREES TO BE REMOVED. NONE OF 'THE EXISTING TREES ARE OAK TREES, <br /> w 1 . TRASH BIN TO BE SET INSIDE PROPOSED BUILDING, <br /> TYP. TYPICAL w 16. PROPOSED FENCE SHALL BE 6' (VERTICAL) CYCLONE FENCING, <br /> P/L PROPERTY LINE w ' 17, AREA ABOVE SPECTIC TANK AND LEACH LINES SHALL BE A LANDSCAPE AREA, <br /> 16, ALL AUTOMOBILE PARKING SPACES AND ALL MAJOR CIRCULATION DRIVE LANES <br /> 5"---�---__-- SEPTIC LEACH LINES SHALL BE 2" ASPHALT OVER APPROPRIATE AGGREGATE BASE, REMAINING AREAS <br /> --- ----. � SHALL BE ALL WEATHER SURFACE. <br /> ------- --- - PROPOSED TRUCK BAY 19. ALL UNPAVED AREAS SHALL BE LANDSCAPE, <br /> EX. 6' TALL SIGN 20, PHASE TWO SHALL BE BUILT WITHIN 5 YEARS OF PHASE 1. <br /> -- - PROPOSED FENCE LINE 90' _3' 21. THE INTENT IS TO MAXIMIZE PERIMETER LANDSCAPING WHEREVER POSSIBLE, <br /> -� BIO-•RT•ENTION SWAL.E/POND <br /> � 5 ` <br /> SEE DETAIL NOTE 16 <br /> SEPTIC SITE REPLACEMENT AREA <br /> EX. ASPHALT CONCRETE <br /> EX. TREE <br /> BE EMO D "� <br /> a PELTIER RD <br /> w w PROPOSED LANDSCAPE - __... ._. <br /> _._._ X <br /> PROPOSED ELECTROLIER <br /> � SITE • <br /> EX. TREE <br /> NOT TO SCALE N,'T.S. 1 590 <br /> S:\2075\ 1590 Use perrnit\5ite Plan,diyg Wr0.3, 20'11 <br />