My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012076
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
22420
>
2600 - Land Use Program
>
PA-1600194
>
SU0012076
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:59:06 PM
Creation date
9/8/2019 12:55:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012076
PE
2626
FACILITY_NAME
PA-1600194
STREET_NUMBER
22420
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220-
APN
01319005
ENTERED_DATE
11/27/2018 12:00:00 AM
SITE_LOCATION
22420 N HWY 99
RECEIVED_DATE
12/4/2018 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\22420\PA-1600194\SU0012076\CDD OK.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of the toilet facilities and the travel distance from work areas. <br /> (12)This project will be required to comply with the Model Water Efficient Landscape Ordinance <br /> requirements of the California Code of Regulations, title 22, Division 2, Chapter 2.7 <br /> I. CALIFORNIA FIRE CODE: The following California Fire Code(CFC) requirements will be applicable <br /> to the proposed project. The following conditions shall be addressed prior to submittal of a building <br /> permit application to the Building Inspection Division: <br /> (1) CFC 507 Fire Protection Water Supply-Fire flow and hydrants shall be provided for the proposed <br /> project by the use of: CFC Appendix B. <br /> (2) Fire Protection Systems required shall be installed according to the CFC, Chapter 9 and the <br /> appropriate standards and guides adopted in Chapter 35 of the California Building Code and the <br /> California Electrical Code. <br /> (3) CFC, Section 503 Fire Apparatus Access Roads- Shall be provided as required by this section. <br /> 503.1.2-A secondary access may be required. <br /> (4) CFC, Section 906 Portable Fire Extinguishers—Provide portable fire extinguishers as required by <br /> this section. <br /> (5) CFC, Section 506 Key Box -A Knox® Box shall be installed according to the local fire district's <br /> instructions. Make application for the key box at the Woodbridge Fire District. If there is an <br /> electronically controlled access gate at this site a Knox®key switch will also be required. <br /> (6) CFC, Section 5001.3.3.1 Properties of Hazardous Materials — A complete list of hazardous <br /> materials used and or stored at this site shall be provided. <br /> (7) CFC, Section 105 Permits: Operational Permit(s) may be required prior to occupancy. <br /> 2) DEPARTMENT OF PUBLIC WORKS (Staff contact:Alex Chetley, [209]468-3023) <br /> a. An encroachment permit shall be required from Caltrans for all work within road right-of-way. <br /> b. Proposed landscaping along roadway shall not obstruct sight distance from the driveway or at the <br /> intersection. <br /> c. All signs visible to traffic on State facilities need to be constructed in compliance with local <br /> government and State regulations. Information regarding the State's regulation of outdoor <br /> advertising may be found online at http://www.dot.ca.gov/hq/oda <br /> d. The developer shall provide drainage facilities in accordance with the San Joaquin County <br /> Development Standards. Retention basins shall be fenced with six (6) foot high chain link fence or <br /> equal when the maximum design depth is 18 inches or more. Required retention basin capacity <br /> shall be calculated and submitted along with a drainage plan for review and approval, prior to <br /> release of building permit. (Development Title Section 9-1135) <br /> e. The Traffic Impact Mitigation Fee shall be required for this application. The fee is due and payable <br /> at the time of building permit application. The fee will be based on the current schedule at the time <br /> of payment. The fee shall be automatically adjusted July 1 of each year by the Engineering <br /> Construction Cost Index as published by the Engineering News Record. (Resolutions R-00-433) <br /> f. The Regional Transportation Impact Fee shall be required for this application. The fee is due and <br /> payable at the time of building permit application. The fee will be based on the current schedule at <br /> the time of payment. (Resolution R-06-38) <br /> PA-1600194 (TE, UP) Conditions of Approval 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.