Laserfiche WebLink
• Spill Prevention Countermeasures and Control (SPCC) Plan requirement <br /> (Q(F)Threshold quantities of regulated substances stored onsite — California Accidental Release <br /> Prevention (CaIARP) Program (Title 19 Section 2735.4 & HSC Section 25531 et sec.) <br /> • Risk Management Plan requirement for covered processes <br /> h. if an undeFgFeURd storage tank(UST) system will be installed, a permit is required to be submitted <br /> UST system installed-. <br /> .. <br /> the <br /> if 1,320 gallons oF mere of petreleurn is to be stored abevegreund theR a Spoil PreveRti(DR, <br /> in a below grade vault, aR SPGG plan is Fequired. <br /> 5) SAN JOAQUIN COUNCIL OF GOVERNMENTS (Staff contact: Laurel Boyd, [209] 235-0600) <br /> a. This project is subject to the San Joaquin County Multi-Species Habitat Conservation and Open <br /> Space Plan (SJMSCP). This can be up to a 90-day process and it is recommended that the <br /> project applicant contact SJMSCP staff as early as possible. It is also recommended that the <br /> project applicant obtain an information package. <br /> 6) AIRPORT LAND USE COMMISSION (Staff contact: Joel G. Campos, tune <br /> 9454 L2091 235-1090) <br /> a. New land uses that may cause visual, electronic, or increased bird strike hazards to aircraft in flight <br /> shall not be permitted within any airport's influence area. Specific characteristics to be avoided <br /> include: <br /> (1) Glare or distracting lights which could be mistaken for airport lights. Reflective materials are <br /> not permitted to be used in structures or signs (excluding traffic directing signs). <br /> (2) Sources of dust, steam, or smoke which may impair pilot visibility. <br /> (3) Sources of electrical interference with aircraft communications or navigation. No transmissions <br /> which would interfere with aircraft radio communications or navigational signals are permitted. <br /> (4) Any proposed use, especially landfills and certain agricultural uses, that creates an increased <br /> attraction for large flocks of birds. <br /> b. Occupied structures must be soundproofed to reduce interior noise to 45 decibel (dB)according to <br /> State guidelines. <br /> c. Within the airport's influence area, ALUC review is required for any proposed object taller than 100 <br /> feet above ground level (AGL). <br /> d. Regardless of location within San Joaquin County, ALUC review is required in addition to Federal <br /> Aviation Administration(FAA) notification in accordance with Code of Federal Regulations, Part 77, <br /> (https://oeaaa.faa.gov/oeaaa/external/portal.osp) for any proposal for construction or alteration <br /> under the following conditions: <br /> (1) If requested by the FAA. <br /> (2) Any construction or alteration that is more than 200 ft. AGL at its site. <br /> PA-1600194 (TE, UP) Conditions of Approval 8 <br />