Laserfiche WebLink
Mr-VIJtIJ bi 1 t FLAN <br /> Appiicatm# PA 16 0 019 4 <br /> Rewive6 Dy <br /> J SITE ELAN <br /> FEDRUMY,401] <br /> I d <br /> N 1•=5p• PE(' W DANA <br /> I <br /> PROPOSE SFPIIC PROPOSED 2063 PRONOENCE WAY <br /> LEACH UNE. REPIACENENT (209 CA.95242 <br /> 5'To P/L ANEA BID (z09)mo-4en <br /> 303' 10 LANDSCAPE <br /> -1- <br /> 918 C RE 1 0 BANK TOE <br /> EN � <br /> ROPOSED PRE DILLON k MURPHY <br /> SUPPRESSION TANK P.O.BOX 21M <br /> Ba]N.CLUM AVENUE SUITE A2 <br /> IS ® PROPOSED LOW.CA. 95241 <br /> �2Q N T BIo-RE//iPpENnN <br /> ]'E sa'(TYPI-� (IgXOVDDRIATE (209)334-6613 <br /> SPVNIFA LANDSCAPING) <br /> 40 tiWRX <br /> NO7E5 <br /> 6Y pa I. APN: N3-190-05 <br /> 2 WATER: PROPOSED PRIVATE WELL <br /> p 3. : M DRAINAGE' <br /> SEWER: PROPOSED SEPTIC <br /> p 3 4. STORM DRAINAGE: N-SITE REIENRN PND <br /> 1u 5. SUE ADDRESS: 12420 N.99 FRONTAGE M. <br /> CAMP0.CA. 95220 <br /> OLLOSEO PROPOSED SCALE 8. ROBB ZNE ZGME X. <br /> A <br /> PRMAP N0.OA."MIW OCTOBER 18,2009 <br /> ____ _ _ ]. STNUCNRE 1-40'X35 PROPOSED OFFICE 1400 B.F.(PHASE I). <br /> 4� 40'X85 (PHASE 2). 4000 S.P TOTAL WHIR A 2 STORY MAX. <br /> u F 0. STRUCTURE 2-20'X100'PROPOSED ONE STORY.IDCO OF.SHOP. <br /> F INCLUDING A 30'X30OFFICE 900 S.F. <br /> P ^>' {/3 B. 91£AONE55: 22420 N.SIB FRONTAGE RD. <br /> � J -S1R11CNliE 3 g TO NE OF THE BAYS SHP11 BE USED FOR GENERAL SERNCMC OF 1RVCK5. <br /> 11. EMPLOYEE'S SHAUL PARK THEIR PERSONAL VEHICLE IN THE SAME SPOT <br /> THEY PULL THE 1RUIX BUT FROM. <br /> b+ 12 THERE ARE 63 CROSSED TRUCK PARKING SPOTS. <br /> 55 10' 13 THE <br /> PROJECT 9lE SLNES SOUTH EAST CONFORMING TO STATE <br /> WASH BAY HIGHWAY 99 AXD N 99 FRONTAGE R0. <br /> 14. EKISTINC TREES TO BE flMNED.NONE OF THE EXISTING TREES ARE OAK TREES <br /> TRASH SIN TO HE SET I FGEND W® i6. PROPOSED FLRCE SHALL BEE6P(VERRCAL)CROPOSED YCLONE FORCING. <br /> TYP. TYPICAL T i]. AREA ABOVE SPECRC TANK ANO LEACH ONES 91ALL BE A LANDSCAPE AREA. <br /> PSL PROPERTY GORE ~ 18. UBTCNOBIMPXALIT OVER AAPPROPfiAIE ACdtECATE <br /> AGE.REMAINING NO MEAS <br /> SEPRC LEAN UNES 1 SHALL BE ALL WTATHFF SURFACE <br /> 19. ALL,UNPAVEII AREAS SHALL BE LANDSCAPE <br /> ----------- PROPOSED 1RVCK BAY 10 LANDSCAPING 6,1�M� 20. PHASE TWO SHALL BE BUILT WITHIN 5 YEARS OF PHASE I. <br /> 21. THE INTENT IS TOMAXIMIZE PERIMETER LANDSCAPING WHEREVER POSSIBLE <br /> 11 <br /> PROPOSED FENCE UNE @ 90' . PROPOSED LEACH UNES ME IDS LNC WTH PI15.THERE IS 12'SEPMARN <br /> --- BIO-RETENTION SWAIE/PND BETWEEN TEACH LINES. <br /> 23 THE REPLACEMENT LEACH FIELD 15 SIZED FOR VXXX REPLACEMENT AND <br /> SEE DETAIL NOTE 10 MAINTAINS MF 5'SETBACK FROM THE PROPERTY LINE. <br /> > i <br /> SEPTIC STE REPLACEMENT AREA C <br /> W¢ <br /> EX.ASPHALT CONCRETE 4 m <br /> PEIIIER FID � m <br /> PROPOSED LANDSCAPE 5' f.} <br /> PROPOSED ELECTROUEfl SITE <br /> 0 EX.TREE <br /> RECRUIT A-A LIaNITY MAP <br /> HOT To SCALE N.T.S. 1590 <br /> 5,\2O15\l590\Use P R\SR.PkY.oAq Apr 25, 2017 <br />