Laserfiche WebLink
*ftpol '"001 <br /> Kerry Sullivan <br /> COMMUNITY DEVELOPMENT <br /> PA-03-444(SA) <br /> 3. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable <br /> at the time of building permit application. (The fee currently is 174.39 per additional daily trip-end <br /> generated in the Lodi area. The fee shall be automatically adjusted July 1 of each year by the <br /> Engineering Construction Cost Index as published by the Engineering News Record.) <br /> (Resolutions 00-433) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 5. Verification shall be obtained from the Solid Waste Division(468-3066)that this development has met <br /> the requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon <br /> submittal of verification. <br /> 6. This area has been subject to historic flooding, therefore, all new structures and/or substantial <br /> improvements constructed on this parcel shall be elevated a minimum of two(2) foot above the highest <br /> adjacent grade. <br /> 7. A State National Pollutant Discharge Elimination System(NPDES)Construction Permit Notice of <br /> Intent(NOI) shall be filed with the State Water Resources Control Board if over one (1)acre of total <br /> ground is disturbed. <br /> S. A traffic study is Lecittited PriVL tV ftpplMal Vf this applkati0n, due to the traffic being geLICIated by-this <br /> �c stud ed, eounty staff vo ill deennined the final scupc of work. The dcvc1opct shall deposit funds <br /> VV ith tile eounty fbi all costs, as estimated by the Dcpwtnient of Public Wv,ks FaCilitiCS DiVibi0n, p! <br /> . . i by the tLaffiC study shall be provided by the applicant <br /> NOTE: Any construction activity that results in the disturbance of at least one (1) acre of soil shall require a <br /> State NPDES construction permit. <br /> DTP:DG:ar <br /> PACOMMENTS\SA\YR 2003\PA-0300444(mision).wpd <br />