My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004226
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
24155
>
2600 - Land Use Program
>
PA-0300344
>
SU0004226
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:58:51 PM
Creation date
9/8/2019 12:56:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004226
PE
2632
FACILITY_NAME
PA-0300344
STREET_NUMBER
24155
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
APN
00516011
ENTERED_DATE
5/14/2004 12:00:00 AM
SITE_LOCATION
24155 N HWY 99
RECEIVED_DATE
9/15/2003 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\24155\PA-0300344\SU0004226\CORRESPOND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
*ftpol '"001 <br /> Kerry Sullivan <br /> COMMUNITY DEVELOPMENT <br /> PA-03-444(SA) <br /> 3. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable <br /> at the time of building permit application. (The fee currently is 174.39 per additional daily trip-end <br /> generated in the Lodi area. The fee shall be automatically adjusted July 1 of each year by the <br /> Engineering Construction Cost Index as published by the Engineering News Record.) <br /> (Resolutions 00-433) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 5. Verification shall be obtained from the Solid Waste Division(468-3066)that this development has met <br /> the requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon <br /> submittal of verification. <br /> 6. This area has been subject to historic flooding, therefore, all new structures and/or substantial <br /> improvements constructed on this parcel shall be elevated a minimum of two(2) foot above the highest <br /> adjacent grade. <br /> 7. A State National Pollutant Discharge Elimination System(NPDES)Construction Permit Notice of <br /> Intent(NOI) shall be filed with the State Water Resources Control Board if over one (1)acre of total <br /> ground is disturbed. <br /> S. A traffic study is Lecittited PriVL tV ftpplMal Vf this applkati0n, due to the traffic being geLICIated by-this <br /> �c stud ed, eounty staff vo ill deennined the final scupc of work. The dcvc1opct shall deposit funds <br /> VV ith tile eounty fbi all costs, as estimated by the Dcpwtnient of Public Wv,ks FaCilitiCS DiVibi0n, p! <br /> . . i by the tLaffiC study shall be provided by the applicant <br /> NOTE: Any construction activity that results in the disturbance of at least one (1) acre of soil shall require a <br /> State NPDES construction permit. <br /> DTP:DG:ar <br /> PACOMMENTS\SA\YR 2003\PA-0300444(mision).wpd <br />
The URL can be used to link to this page
Your browser does not support the video tag.