My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004226_SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
24155
>
2600 - Land Use Program
>
PA-0300344
>
SU0004226_SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:52:14 PM
Creation date
9/8/2019 12:56:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0004226
PE
2632
FACILITY_NAME
PA-0300344
STREET_NUMBER
24155
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
APN
00516011
ENTERED_DATE
5/14/2004 12:00:00 AM
SITE_LOCATION
24155 N HWY 99
RECEIVED_DATE
9/15/2003 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\24155\PA-0300344\SU0004226\NL STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
`,, 1.0of <br /> Mr. Sandi De Jong <br /> September 25,2003 <br /> Page 9 <br /> Because the deep percolation test achieved a satisfactory percolation rate,the Site has met the <br /> requirement for a satisfactory percolation rate with the use of seepage pits according to the <br /> sewage standards of San Joaquin County Environmental Health Department. <br /> 6.0 PERCOLATION TEST INFORMATION <br /> ( , Percolation Test Boring Locations <br /> Two (2)percolation tests were performed on July 11, 2003, within an area described for the d 'W#"O" <br /> septic_ system. One shallow and one deep percolation test boring were advanced in an area n ' <br /> indicated in Plate 1. �( <br /> ✓6.2 Boring Preparation and Specifications <br /> The shallow boring was advanced to 3.5 feet and the deep boring to 14.5 feet. All four borings <br /> were drilled using a truck-mounted Deep Rock auger rig on July 10, 2003. <br /> A 2-inch diameter PVC pipe with perforations on the bottom was used to measure the drop of <br /> water in the percolation test boring. Approximately 2 inches of"pea gravel"were placed in the <br /> bottom of the boring, then the PVC pipe was installed on top of the gravel. Several feet of"pea <br /> gravel'were backfilled in the annular space. <br /> ✓6.3 Presaturation of Borings <br /> Presaturation of the percolation test holes occurred on July 10, 2003. The depth of water used to <br /> presoak was 12 inches above the bottom of the borings. After the 24-hour soak period, the <br /> presaturated holes were found to be intact and dry on July 11, 2003. <br /> ✓6.4 Percolation Test Procedure and Results <br /> A percolation test was conducted on the shallow and deep boring on July 11, 2003 in accordance <br /> with the requirements of San Joaquin County Environmental Health Division. The last half hour <br /> of the 4-hour percolation tests was observed by Lisa Medina, Environmental Health Inspector, of <br /> that office. The percolation test sheets indicate the property owner is Ray Thompson who was <br /> the property seller in July when the percolation tests were performed. <br /> .� Measurement of the water level during the percolation test was from a fixed reference point on <br /> the PVC casing using an electric well sounder with an depth accuracy of 1/1 00th foot. All <br /> ?pE RJO <br /> ♦ 1 <br /> � > n <br /> Z r <br /> O ti <br /> �'tSOG♦ <br />
The URL can be used to link to this page
Your browser does not support the video tag.