Laserfiche WebLink
O�q.UrN' C <br /> VA - 06004 1 0 'TE APPROVAL <br /> ).•'�...�t''.O <br /> Q: <br /> " SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> " 1810 E. HAZELTON AVENUE,STOCKTON CA 95205 <br /> BUSINESS PHONE: (209)468-3121 <br /> •. :��;P Business Hours: 8:00 a.m. to 5:00 p.m. (Monday through Friday) <br /> �lFOR <br /> ,� 3 �t�=���",�' ' :� p►.�'..PLIEAIp"I�:PI2.f�CESSfNG�bSw�'EPS yS }� �� � � $°���„t��� , �.,k.�` <br /> STEP 1 CHECK WITH STAFF - Development Services Staff will explain the requirements and pro8edures to you. <br /> STEP 2 SUBMIT YOUR APPLICATION -When you apply,file all of the following: <br /> • FEE The staff will let you know the current cost of filing an application. Make checks payable to the San Joaquin <br /> County Treasurer. <br /> • FORM Seven (7)copies of the completed application information forms(attached)which all owners must sign. <br /> • SITE PLAN Seven(7)copies of a folded Site Plan (see attached)and two (2)copies of a legible 8-1/2"x 11"site plan. <br /> • HAZARDOUS One copy of a completed Hazardous Materials Disclosure Survey form (a copy of the form is attached). <br /> MATERIALS <br /> • DEED One copy of the recorded deed(s)of the property. <br /> • SERVICES If your project requires connection to public facilities,you must submit a"will-serve"letter from the appropriate <br /> water, sewer and drainage entities at the time of filing. This letter must include a statement from the agency <br /> that they will serve the proposed development, and has,or will have,the capacity to provide such service. <br /> • APPLICATION Staff will check your application. If anything is missing, you will be notified in writing. The applicant will be <br /> COMPLETE sent a postcard once the application has been determined complete. (Your application cannot be processed <br /> until it is com lete. <br /> STEP 3 APPLICATION PROCESSING <br /> • CEQA The County will decide if the proposal will have an adverse effect on the environment. If there are no adverse <br /> effects,the application will be processed. If there are potential adverse effects, further environmental review <br /> will be required. Projects that have the potential to adversely affect the environment will require the <br /> preparation of an E.I.R. This may extend the processing time. <br /> • REFERRALS Staff will refer the application to any County departments, other agencies and surrounding property owners <br /> AND ACTION affected by your proposal. At the end of a review and comment period the staff will approve your application if <br /> they can make required findings. If the staff cannot make the required findings, the application will be denied. <br /> Typically action will be taken on the project within 7-8 weeks. <br /> • FINAL ACTION The action of the staff can be appealed to the Planning Commission. The staffs action is final unless <br /> appealed. For further information on the length of the appeal period, contact the staff. <br /> STEP 4 CONDITIONS AND ADDITIONAL PERMITS <br /> • CONDITIONS The staff will send you the final action and if it is approval it will list conditions, by department,that must be met <br /> before you can start project. <br /> • IMPROVEMENT In addition to the Site Plan, an Improvement Plan is frequently required as a condition of approval. This is an <br /> PLANS engineered plan showing drainage,grading,frontage improvements, access,on-and off-site service and utility <br /> facilities, landscaping and circulation/parking details. <br /> • DRIVEWAY Driveway Permits must be acquired from the Public Works Department for any work performed within the <br /> PERMITS road right of way. If the project fronts on a state highway these permits are obtained from Caltrans. <br /> • SANITATION & Projects that will utilize new on-site sanitation disposal and/or on-site wells, must get permits from the <br /> WELL PERMITS Environmental Health Division. <br /> • BUSINESS If the project involves a business, a Business License must be approved prior to starting operation. Business <br /> LICENSES License applications can be processed concurrently with the Site Approval application. <br /> • BUILDING If the project involves construction a building permit must be approved prior to commencement of work. <br /> PERMITS <br /> • OTHER Frequently other local, state and/or federal agencies will require permits prior to new uses being established <br /> PERMITS (e.g.Air Pollution Control District, Regional Water Quality Control Board or the Sheriffs Office). The <br /> Community Development Department will identify additional permits we are aware of that may be required for <br /> our project. <br /> F\DEVSVC\Planning Application Forms\Site Approval.(Revised 1-3-03) Page 1 of 9 <br />