My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0010760_SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
24511
>
2600 - Land Use Program
>
PA-1600008
>
SU0010760_SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:52:20 PM
Creation date
9/8/2019 12:56:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0010760
PE
2625
FACILITY_NAME
PA-1600008
STREET_NUMBER
24511
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220-
APN
00516015
ENTERED_DATE
1/22/2016 12:00:00 AM
SITE_LOCATION
24511 N HWY 99
RECEIVED_DATE
1/22/2016 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\24511\PA-1600008\SU0010760\SS_NL STUDY .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• TABLE OF CONTENTS <br /> SOIL SUITABILITY STUDY.............................................................................................1 <br /> Introduction.................................................................................................................1 <br /> ProposedDevelopment..............................................................................................1 <br /> SiteDescription...........................................................................................................1 <br /> Existing and Proposed Septic Tank Usage..............................................................2 <br /> ExistingSeptic System...................................................................................2 <br /> ProposedSeptic System................................................................................2 <br /> On-Site Septic Permit History.........................................................................2 <br /> Existing Septic Tank Usage in the Vicinity.....................................................3 <br /> Septic Permit History in the Vicinity................................................................3 <br /> Ground Water Information .........................................................................................3 <br /> Depthand Gradient........................................................................................3 <br /> Potential Ground Water Contamination Issues ..............................................4 <br /> On-Site Wells..................................................................................................4 <br /> WaterSample.................................................................................................5 <br /> Soil Profile and Geologic Information.......................................................................6 <br /> SoilBorings....................................................................................................6 <br /> Discussion of Soil Lithology............................................................................ 7 <br /> PercolationTest..........................................................................................................7 <br /> Preparation and Presaturation of Percolation Test Holes.............................. 7 <br /> • Percolation Test Procedure............................................................................ 7 <br /> Percolation Test Results ................................................................................8 <br /> Discussion of Percolation Test Results..........................................................8 <br /> Discussion of Septic System Sizing...............................................................8 <br /> NITRATELOADING STUDY...........................................................................................9 <br /> Mass Transport Soil Properties.................................................................................9 <br /> Sourcesof Nitrate.....................................................................................................10 <br /> Contribution of Rainfall............................................................................................10 <br /> Quantity and Quality of Domestic Wastewater......................................................11 <br /> Denitrification Reductions.......................................................................................14 <br /> Nitrate Loading Estimate—Existing and Proposed Facilities...............................15 <br /> Nitrate Loading Estimate—Existing Facilities Only.......................................16 <br /> Discussion of Nitrate Loading Results...................................................................17 <br /> Total Nitrate Impact...................................................................................... 17 <br /> CONCLUSIONS AND RECOMMENDATIONS..............................................................18 <br /> LIMITATIONS.................................................................................................................19 <br /> SELECTEDREFERENCES...........................................................................................20 <br /> • <br /> LOGE 1711 <br />
The URL can be used to link to this page
Your browser does not support the video tag.