Laserfiche WebLink
USE PERM11` <br /> SAN JOAQUIN COUNTY COMMUNITY DEVELO NT ppEPARTMENT <br /> - y9 - 11 <br /> FILE NUMBER: UP- <br /> • qP.• 1890 EAST HAZELTON AVENUE, STOCKTON, CA 95205 <br /> TELEPHONE: (209) 468-3120 <br /> BUSINESS HOURS: 8:00 a.m. to 5:00 p.m. <br /> (Monday through Friday) <br /> APPCICATIOKPROCESStNG`STE. <br /> 0-0- <br /> STEP 1 CHECK WITH STAFF- Community Development Staff will explain the requirements and procedures to you. <br /> STEP 2 SUBMIT YOUR APPLICATION- When you apply,file all of the following: <br /> • FEE The staff will let you know the current cost of filing an application. Make checks payable to the San Joaquin <br /> County Treasurer. <br /> • FORM Seven(7)copies of the completed application information forms(attached)which all owners must sign. <br /> • SITE PLAN Seven(7)copies of a folded Site Plan(see attached)and two(2)copies of an 8-112' x 11'reduced copy of the <br /> plan. <br /> • HAZARDOUS One copy of a completed Hazardous Materials Disclosure Survey form(a copy of the form is attached). <br /> MATERIALS <br /> • DEED One copy of the recorded deed(s)of the property. <br /> • SERVICES If your project requires connection to public facilities,you must submit a'will-serve'letter from the appropriate <br /> water,sewer and drainage entitles at the time of filing. This letter must include a statement from the agency that <br /> they will serve the proposed development,and has,or will have,the capacity to provide such service. <br /> • APPLICATION Staff will check your application. if anything Is missing,you will be notified In writing. The applicant will be sent a <br /> COMPLETE postcard once the application has been determined complete. (Your application cannot be processed until it is <br /> complete.) <br /> STEP 3 APPLICATION PROCESSING <br /> • CF-QA The County will decide if the proposal will have an adverse effect on the environment If there are no adverse <br /> effects,the application will be processed. If there are potential adverse effects,further environmental review will <br /> be required. Projects that have the potential to adversely affect the environment will require the preparation of an <br /> E.I.R. This may extend the processing time. <br /> • REFERRALS Staff will refer the application to any County departments,other agencies and surrounding property owners <br /> AND ACTION affected by your proposal. At the end of a review and comment period a staff report will be prepared and the <br /> Planning Commission will hold a public hearing. N the Commission can make the required findings,the <br /> application will be approved. Typically action will be taken by the Commission within 8 weeks after application. <br /> • FINAL ACTION The action of the Commission can be appealed to the Board of Supervisors. The Commission's action is final <br /> unless appealed. For further Information on the length of the appeal period,contact the staff. <br /> STEP 4 CONDITIONS AND ADDITIONAL PERMITS <br /> 1p <br /> • CONDITIONS The staff will send you the final action and if it is approval it will list conditions,by department,that must be met <br /> before you can start your project <br /> • IMPROVEMENT in addition to the Site Plan,an Improvement Plan is frequently required as a condition of approval. This is an <br /> PLANS engineered plan showing drainage,grading,frontage improvements,access,on-and off-site service and utility <br /> facilities,landscaping and circulation/parking details. <br /> • DRIVEWAY Driveway Permits must be acquired from the Community Development Department for any work performed within <br /> PERMITS the road right of way. if the project fronts on a state highway these permits are obtained from Caltrans. <br /> • SANITATION& Projects that will utilize new on-site sanitation disposal and/or on-site wells,must get permits from the <br /> WELL PERMITS Environmental Health Division. <br /> l BUSINESS if the project involves a business,a Business License must be approved prior to starting operation. Business <br /> LICENSES License applications can be processed concurrently with the Use Permit application. <br /> i <br /> • BUILDING If the project involves construction a building permit must be approved prior to commencement of work. <br /> PERMITS <br /> j OTHER PERMITS Frequently other local,state and/or federal agencies will require permits prior to new uses being established(e.g. <br /> Air Pollution Control District,Regional Water Quality Control Board or the Sheriff's Office). The Community <br /> Development Department will identify additional permits we are aware of that may be required for your project <br /> "PA_UP.FRM R• July17,'998 <br />