Laserfiche WebLink
Chandler Martin -2- <br /> COMMUNITY DEVELOPMENT <br /> PA-05-199 (SA) <br /> 3. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application. (The fee currently is$1,291.00 per 1,000 gross square foot of building <br /> designated as Service Commercial in the Lodi area. The fee shall be automatically adjusted July 1 of each <br /> year by the Engineering Construction Cost Index as published by the Engineering News <br /> Record.)(Resolutions 00-433) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 5. On-site drainage must be drained through a sand/oil separator designed for one (1) inch of rain in 24 hours <br /> and shall be shown on the Site Plan. <br /> Note: Any construction activity that results in the disturbance of at least one (1)acre of soil shall require a State <br /> NPDES construction permit. <br /> MRC:DG:ar <br /> PACOMMENTWAWR 2005\PA-0500199.wpd <br />