Laserfiche WebLink
ENVIRONMENTAL HEALTH DEPARTMENT <br /> SAN JOAQUIN COUNTY <br /> Unit Supervisors <br /> 2 Donna K.Heran,R.E.H.S. P <br /> ���� Director. 304 East Weber Avenue, Third Floor Carl Borg,nan,R.E.H.S. <br /> L� ' '- \like Huggins.R.E.H.S..R.D.I. <br /> Al Olsen,R.E.H.S. Stockton, California 95202-2708 Douglas W.Wilson.R.E.H.S. <br /> OgCr FOR�\P Program Manager Telephone: (209) 468-3420 \tarsaret Lagorio.R.E.H.S. <br /> Laurie A.Cotulla,R.E.H.S. Robert McClellon.R.E.H.S. <br /> Program ManagerFax: (209) 464-0138 Mark Barcellos.R.E.H.S. <br /> December 23, 2003 <br /> TO: San Joaquin County <br /> Community Development Department <br /> FROM: San Joaquin County <br /> Environmental Health Department <br /> CONTACT PERSON: Raymond Borges, Lead Senior R.E.H.S., R.D.I. <br /> PHONE NUMBER: (209) 468-3284 <br /> RE: PA-03-587 (SA), Attention: Leanne Mueller <br /> 25655 North State Route 99 West Frontage Road, Acampo <br /> The San Joaquin County Development Title Requirements listed below have been identified as <br /> pertinent to this project. Other requirements may also apply. These requirements cannot be <br /> modified. <br /> A. Environmental Health Department requires a soil suitability study incorporating proposed <br /> staff and customer use, indicating that the area is suitable for septic tank usage. This must be <br /> performed prior to issuance of a building permits (San Joaquin County Development Title, <br /> Section 9-1105.2(d)). A review fee of$186.00 must be paid at time of submittal to <br /> Environmental Health Department. <br /> The sewage disposal system shall comply with the on site sewage standards of San Joaquin <br /> County prior to approval. A percolation test that meets absorption rates of the manual of <br /> septic tank practice or E.P.A. Design Manual for onsite wastewater treatment and disposal <br /> system is required for each parcel. A permit fee of$93.00 per percolation hole is required. <br /> B. State on revised site plans the maximum number of employees and customers the sewage <br /> disposal system is being designed for. In addition, show on revised plans that the leach field <br /> area will be barricaded so it cannot be driven over, parked on, or used as a storage area. This <br /> leach field area must be used for that specific purpose only, and it cannot contain any <br /> underground utility lines (San Joaquin County Development Title, Section 9-1110.4(c)(5)). <br /> In addition, a 100% designed sewage disposal replacement area shall be incorporated into the <br /> revised plans. <br /> NOTE: The proposed leach field area appears to be under sized for the initial septic system. <br /> 0 <br /> Page 1 of 2 <br />