My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0005948
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
26609
>
2600 - Land Use Program
>
PA-0600100
>
SU0005948
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:58:58 PM
Creation date
9/8/2019 12:57:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0005948
PE
2622
FACILITY_NAME
PA-0600100
STREET_NUMBER
26609
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
APN
00509068
ENTERED_DATE
3/7/2006 12:00:00 AM
SITE_LOCATION
26609 N HWY 99
RECEIVED_DATE
3/7/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\26609\PA-0600100\SU0005948\MISC.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Raymond Hoo -2- <br /> COMMUNITY DEVELOPMENT <br /> PA-06-100 (MS) <br /> 2. All easements of record shall be shown on the Parcel Map. (Development Title Section 9-910.20) <br /> 3. Access rights shall be dedicated and restricted for Lot 2 along the frontage of State Highway Route 99 West <br /> Frontage Road on the Parcel Map. (Development Title Section 9-1150.5) <br /> 4. If a hydraulic study indicates that the adjacent drainage channel cannot accept additional runoff, then <br /> drainage from the improved portion of each parcel shall be retained on-site. Drainage for each pond shall be <br /> calculated by a registered civil engineer, an architect, or a licensed contractor, prior to issuance of the <br /> Building Permit. The drainage study shall be completed prior to approval of the Improvement Plans. If <br /> necessary, a note shall be placed on the parcel map requiring the retention ponds. (Development Title <br /> Section 9-1135.9) <br /> 5. The limits of the 100-year Flood Plain shall be delineated on the Parcel Map. A note shall be placed on the <br /> Parcel map which states "No structures shall be place within the limits of the 100-year flood plain." <br /> 6. The property shall transfer to a zone within County Service Area(CSA)49 prior to recording the Parcel <br /> Map to provide for the operation,maintenance, and improvement of street lighting facilities. A new <br /> assessment for the zone shall be approved by the property owners prior to approval of the Parcel Map. The <br /> assessment for the new zone shall be based on the cost for: maintenance,operation, system improvements, <br /> and any replacement program of facilities within CSA 49. The applicant shall pay for the cost to process the <br /> transfer and assessment for the new zone. In addition, the applicant shall pay for the maintenance and <br /> operation of the system from the time the facilities are accepted by the District until the transferred area is <br /> placed on the assessment role of the District. (Development Title Section 9-1100.5) <br /> Note: Any construction activity that results in the disturbance of at least one(1)acre of soil shall require a <br /> State NPDES construction permit. <br /> DG:SH:av <br />
The URL can be used to link to this page
Your browser does not support the video tag.