Laserfiche WebLink
+- I.e <br /> Description of Proposed Project: <br /> The Northern California College of Construction field campus will be located in <br /> Stockton. Training at this site will include the operation of a variety of heavy equipment <br /> by instructors and students. Earthmoving, trenching, excavation and other construction <br /> practices will be taught at this site. Training projects will be generally limited to pad <br /> construction,trenching and road sections. <br /> Field training will be generally conducted from 8 am to 5 pm Monday through Friday. <br /> All field training will be in accordance with Federal, State and local requirements. This <br /> will include safety and environmental regulations. Excavations will be limited less than 4 <br /> feet below ground surface. <br /> The existing site is presently an un-used drive in theater with most of the facilities <br /> removed. Site improvements will be limited to fencing and a gravel parking lot for the <br /> students and instructors. An existing well will be used to supply water for dust control. <br /> Water from this well will be pumped into a Klein Tank for storage. Porta johns will be <br /> provided on site for use by the students and instructors. <br /> Maintenance of the equipment will be limited to minor repairs. No fuels, oils or <br /> lubricants will be stored on site. Fueling and lubrication of the equipment will be <br /> contracted to an outside vendor. <br />