My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0009721
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4258
>
2600 - Land Use Program
>
PA-1300117
>
SU0009721
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:59:03 PM
Creation date
9/8/2019 12:59:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0009721
PE
2632
FACILITY_NAME
PA-1300117
STREET_NUMBER
4258
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215-
APN
17917248
ENTERED_DATE
8/12/2013 12:00:00 AM
SITE_LOCATION
4258 S HWY 99
RECEIVED_DATE
8/9/2013 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\4258\PA-1300117\SU0009721\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
View images
View plain text
This project would consist of a three Phase project, with Phase I to begin immediately, <br /> Phase II within 10 years, and Phase III within 15 years. <br /> Phase I use will be for diesel truck/trailer repair and maintenance and parking of up to <br /> 46 trucks, and 15 ± trucks entering and exiting per day. <br /> There will be no loading or unloading of the trailers at this facility. It is only a staging <br /> location for routing to final destinations. <br /> Phase I construction work would consist of grading, asphalt/concrete driveways and <br /> entrance, a 1,000 square foot office, and minor remodeling of existing 5,000 square foot <br /> building on site for the maintenance shop. An area behind the existing building will be <br /> fenced, graded, lime treated and paved for parking of trucks and trailers. Also, the <br /> existing storm water retention pond would be relocated and expanded. <br /> The office would accommodate up to 5 employees and the maintenance shop up to 3 <br /> employees. They would operate mainly Monday through Sunday from 5 AM to 7 PM. <br /> Phase II would consist of construction of a 2,957 square foot truck wash and lube <br /> building (private use only,not open to public) and related parking and driveways. <br /> Phase III would consist of construction of a 12,000 square foot maintenance shop and <br /> related additional truck parking and driveways. There would also be an extension to the <br /> CMU wall along the south and east property lines. <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).