Laserfiche WebLink
°p4u1ry ° COUNTY OF SAN JOAQUIN THOMAS R.FLINN <br /> 2r •, .A "2 <br /> DEPUTY DYtECiOR <br /> Q:,�.. �i ►- "'1:- DEPARTMENT OF PUBLIC WORKS <br /> 4 t � P.O. BOX 1810- 1810 EAST HAZELTON AVENUE MANUEL LOPEZ <br /> _ STOCKTON,CALIFORNIA 95201-1810 DEPUTY DPIECTOR <br /> �'- (iq;, -.`p•• 209/468-3000 STEVEN WINKLER <br /> FAX:209/468-2999 DEPUTYDm[cioR <br /> HENRY M. HIRATA <br /> DIRECTOR <br /> October 22, 1998 <br /> MEMORANDUM <br /> TO: Thomas M. Gau, Senior Civil Engineer <br /> Community Development Department <br /> CONTACT PERSON: Jeff Fisher <br /> FROM: Gabriel Karam, Senior Civil Engineer �k <br /> Public Services Division <br /> SUBJECT: SA-98-65 A SITE APPROVAL APPLICATION FOR AN OFF PREMISE OUTDOOR <br /> ADVERTISING SIGN (14-FOOT BY 48-FOOT DOUBLE SIGN), LOCATED ON THE <br /> WEST SIDE OF NORTH HIGHWAY 99 EAST FRONTAGE ROAD, 240 FEET NORTH <br /> OF HAMMER LANE, NORTHEAST STOCKTON. (DISTRICT 3). <br /> APPLICANT: B. G. and Premila Suthar APN: 092-090-10 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated Flood Hazard Area. In <br /> addition,the existing San Joaquin County and City of Stockton Flood Insurance Studies,which delineate flood risks, <br /> floodplains and floodway areas, are currently being reevaluated. The reevaluation is being conducted by the Federal <br /> Emergency Management Agency, Region IX, Building 105, Presidio of San Francisco, California 94129-1250, <br /> telephone (415) 923-7186. The reevaluation may delineate additional flood risks. The official flood maps are <br /> available for review at the Department of Public Works, 1810 East Hazelton Avenue, Stockton. These flood maps <br /> will be updated when the reevaluation process is completed. <br /> North 99 Frontage Road has an existing right-of-way width of 45.5 feet and a planned right-of-way width of 45.4 feet. <br /> RECOMMENDATIONS: - - <br /> None, however, the proposed location of the sign may interfere with the future State Highway Route 99 and <br /> Hammer Lane interchange. <br /> GK:RH:gn <br /> PSdJiN.G18 <br /> E: Manuel Lopez, Deputy Director/Development <br />