My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007124_SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
8606
>
2600 - Land Use Program
>
PA-0800108
>
SU0007124_SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:52:18 PM
Creation date
9/8/2019 1:00:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0007124
PE
2626
FACILITY_NAME
PA-0800108
STREET_NUMBER
8606
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
APN
08530032
ENTERED_DATE
4/9/2008 12:00:00 AM
SITE_LOCATION
8606 N HWY 99
RECEIVED_DATE
4/8/2008 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\8606\PA-0800108\SU0007124\SS STDY_NL STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dec 17 2008 10: 30RM � LRSERJET 3200 p, 2 <br /> I <br /> i <br /> f December 15, 2008 <br /> FOR: San Joaquin County Environmental Health Department <br /> Mr. Rodney Estrada., R.E.H.S. <br /> 600 East Main Street <br /> Stockton, CA 95202 <br /> PROJECT: Proposed Madina Center of North Stockton <br /> 8606 North State Route 99 East Frontage Road <br /> Stockton, CA 95212 <br /> PA-08-108 (UP) <br /> SUBJECT: Nitrate Loading Study and Soil Suitability Y Stud Addendum <br /> Reference is made to the two above-referenced Studies Chesney Consulting completed for the <br /> proposed Madina Center project in June and July of 2008. These Studies, in their entirety, were <br /> found to be acceptable to EHD in their Approval Letter dated.A� ust 15 2008_ <br /> P g , <br /> E In the interim,Mr. Rodney Estrada received from the San Joaquin County Planning Department, <br /> a document produced by Mr. Amin Mahmood, the engineer for this project. There has now been <br /> a change in the number of daily services from one service to five services, with an anticipated 20 <br /> people at each service(plus one caretaker for a total of 21). Additionally, there will classes for <br /> approximately 40 children on the weekends. These changes in the number of on-site people will <br /> change the average daily flow (ADF), and consequently, the nitrate loading calculations. Mr. <br /> Estrada has requested this Addendum to document these changes in the calculations, as follows: <br /> i <br /> The original calculations for proie weekly wastewater flw were estimated to be; <br /> I <br /> 4, ople x 5 gals/person x 6 d/week=630 gals <br /> 29 eo le x 5 gals/person x 1 d/week= <br /> p g p eek 1,475 gals <br /> Total wastewater flow per week=2,105 gals/week I <br /> Total wastewater flow per year.=2,105 x 52 weeks/yr= 109,460 gals/yr <br /> The proposed increase of five services mr dgy, each with 21 people and 40 students on e <br /> weekends will now theoretically create a total wastewater flow on a weekly and yearly basis to be: <br /> 21 people x 5 services per day x 5 gals/person x 6 d/week= 3,150 gals <br /> 295 people x 5 gals/person x 1 d/week(Fridays) = 1,475 gals <br /> 40 students x 5 gal/student x 2 d/week (Saturday and Sunday) =400 gals <br /> Total wastewater flow per week =5,025 gals/week <br /> Total wastewater flow per year=5,025 x 52 weeks/yr= 261,300 gals/yr � <br /> Page 1 of 3 <br /> P. Q. Box 3794 • T'urCock, CSL 95381 + Office (209) 668-1403 • Fax(209) 668-2598 <br /> r <br /> II <br /> L <br />
The URL can be used to link to this page
Your browser does not support the video tag.