Laserfiche WebLink
CONDITIONS TO BEVE AGREEMENT BEING APPEALED <br /> 1 (a) A previously submitted detention/retention system <br /> meets all requirements and, at the same time, provides for safety <br /> concerns to airport. <br /> l (d) The time in which frontage improvements are to be <br /> made , applicant was led to believe it was to occur when there were <br /> 250 employees . <br /> 1 (i) If unable to acquire private easements , the land <br /> will be land-locked without ability to develop unless alternative <br /> drainage plans are authorized. <br /> 5 (a) and (b) Use of retention/detention ponds should be <br /> considered as appropriate alternatives with appropriate <br /> precautionary measures . Approval of drainage and construction, <br /> except for the fence detail, should not require FAA or airport <br /> approval. <br />