Laserfiche WebLink
Ms. Mueller `� July 21, 2003 <br /> PA-0300318 Page 3 <br /> - Replace fossil-fueled equipment with electrically driven equivalents (provided they are not run via <br /> portable generator set). <br /> - Install wind breaks on windward sides of construction areas. <br /> - Curtail construction during periods of high ambient pollutant concentrations. This may include ceasing <br /> construction activity during peak-hour vehicular traffic on adjacent roadways, and "Spare the Air Days" <br /> declared by the District. <br /> o The applicant should require that all diesel engines be shut off while on the premises to reduce <br /> emissions from idling. <br /> District staff is available to meet with you and/or the applicant to further discuss the regulatory <br /> requirements that are associated with this project. If you have any questions or require further <br /> information, please call Mr. John Cadrett in the District's North Office at (209) 557-6475 or Mr. Hector <br /> Guerra, Senior Air Quality Planner at (559)230-5800. <br /> Sincerely, <br /> 0,1 <br /> Chrystal L. Meier <br /> CEQA Commenter <br /> Central f3egion <br /> Aenioctor R. Guerra <br /> r Air Quality Planner <br /> Enclosures <br /> C: John Cadrett, Northern Office <br /> File <br />