My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
9763
>
2600 - Land Use Program
>
PA-1600184
>
SU0012016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:59:06 PM
Creation date
9/8/2019 1:00:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012016
PE
2626
FACILITY_NAME
PA-1600184
STREET_NUMBER
9763
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212-
APN
12429006, 12429005
ENTERED_DATE
10/9/2018 12:00:00 AM
SITE_LOCATION
9763 N HWY 99
RECEIVED_DATE
10/16/2018 12:00:00 AM
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\9763\PA-1600184\SU0012016\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
h. The Water Supply Facilities Impact Mitigation Fee shall be required for this development. The fee <br /> is due and payable prior to issuance of the building permit. The fee will be based on the current <br /> schedule at the time of payment. (Development Title Section 9-818.4 and Resolutions R-91-327, <br /> R-94-185 and R-97-5) <br /> L It is the responsibility of the applicant to ensure that a current will-serve letter from the City of <br /> Stockton for sanitary sewer,water, and storm drain service for this development are on file prior to <br /> applying for a building permit. Additionally, the current owner of the property will be responsible to <br /> ensure that there is capacity in the system at the time of issuance of a building permit. <br /> j. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> k. This project falls within the definition of a Regulated Project as defined in either the County Post- <br /> Construction Standards Manual or the County Phase II National Pollutant-Discharge Elimination <br /> System (NPDES) permit and shall comply with the following conditions: <br /> (1) A registered professional engineer shall design a system or combination of systems to <br /> infiltrate,treat, and/or filter the 85th percentile stone as defined in the Multi-Agency Post- <br /> Construction Stormwater Standards Manual (Manual). Manual can be found by going to <br /> http://sjcleanwater.org/Phase2.htm <br /> (2) Owner shall submit a"Storm Water Pollution Prevention Plan"(SWPPP)to Public Works for <br /> review. A SWPPP preparation guide is available at the Department of Public Works. A <br /> copy of the SWPPP shall be maintained on the construction site and presented to any <br /> County, State or Federal employee on demand. The SWPPP onsite shall include all <br /> required records, updates, test results and inspections. The post construction chapter of <br /> the SWPPP must identify expected pollutants and how they will be prevented from entering <br /> the stone system. The chapter shall also contain a maintenance plan, a spill plan, and a <br /> training plan for all employees on proper use, handling and disposal of potential pollutants. <br /> The example plans are available in the CASQA handbooks. <br /> (3) The owner shall be responsible for providing the County with an annual report of operation <br /> and maintenance of any system. The property owner shall also be responsible for the <br /> payment to the County of an annual system inspection fee established by Resolution of <br /> the Board of Supervisors. <br /> (4) A Maintenance Plan shall be submitted and the execution of a Maintenance <br /> Agreement with San Joaquin County shall be required for the owner/operator of <br /> stonmwater cont€ols prior to the release of the building permit. <br /> (5) Standard Best Management Practices,for the type of development proposed, shall be <br /> incorporated into the site design. <br /> (6) Wastewater shall NOT be allowed into the storm drainage system. <br /> Informational Notes: <br /> (i.) A Solid Waste Diversion Plan for all applicable projects must be submitted to the Building Division <br /> of the Community Development Department prior to issuance of the building permit. Contact the <br /> Solid Waste Division(468-3066)for information. <br /> (ii.) This property is subject to the requirements of San Joaquin County Mosquito & Vector Control <br /> District(209-9824675)and the California Health and Safety Code for the prevention of mosquitoes. <br /> Best Management Practices (BMP) guidelines for stormwater devices, ponds and wetlands are <br /> available. <br />
The URL can be used to link to this page
Your browser does not support the video tag.