Laserfiche WebLink
„. APPLICATION - USE PERMIT <br /> a:�E coc <br /> 2' <br /> SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> FILE NUMBER: UP- <br /> Existing Roads <br /> Road/Street Name R.O.W.Width Pavement Width Curb/Gutter Sidewalks <br /> Naglee Rd 45' 21' Yes ❑ No® Yes ❑ No JZ <br /> Larch Rd 45' 20-22' Yes ❑ No® Yes ❑ No <br /> Surface Transportation Assistance Act STAR trucks <br /> Will STAA type trucks, over California Legal length, be used as part of the proposed operation? <br /> Yes ❑ (if yes,the applicant must provide a letter requesting designation of the proposed facility as an STAA terminal.) <br /> No <br /> ENVIRONMENTAL INFORMATION <br /> USE ADDITIONAL PAPER, IF NECESSARY) <br /> Water, Drainage and Flooding <br /> Describe any areas subject to flooding (include flood depths and flood panel map number): <br /> The site is in FEMA flood zone AE, BFE = 13.0', map 06077CO59OF <br /> Describe the current depth of the ground water and depth to potable water: <br /> Unknown. Will be determined by field testing. <br /> Describe any existing drainage courses oreroded areas on or nearthe project site(e.g. rivers,creeks,swales or drainage ditches): <br /> There is an existing drainage ditch to the south that drains to a City of Tracy storm drain. There is no proposed connection <br /> to this drainage system. <br /> Land, Land Use and Biota <br /> Describe the site's topography(e.g. land forms, slopes,etc.): <br /> The site is relatively flat, gently sloping to the north. <br /> Describe agricultural land that will be lost as a result of the project(type of crops, acres,quality of soil, etc.): <br /> The site is currently unused for agriculture. <br /> Describe any wildlife habitat on-site and species that are of may be present: <br /> The primary wildlife habitat is annual grassland. There are a few trees for arboreal species to habitat. <br /> Describe any vegetation on-site by type and extent: <br /> The primary vegetation on-site is common grass and weeds. <br /> Air Quality <br /> Describe air pollutants that may result from the project(e.g. construction related dust,vehicle trips per day,fire places, incinerators, <br /> etc.): <br /> Construction activities will generate dust and exhaust on a temporary basis. The contractor will implement standard BMPs <br /> to minimize pollutant impact. The project includes a kitchen serving around 200 meals a day. The developed <br /> site is expected to have minimal trips per day on weekdays. On Sundays, the site is expected to have 200-3 0 <br /> trips. The developed project will insignificantly increase regional traffic and not decrease air quality. <br />