Laserfiche WebLink
S TE #✓i_AN <br /> AWp csbon # 9 008 ; <br /> Received By On �( <br /> USE PERMIT <br /> FOR <br /> GURDWARA SAHIB TRACY <br /> PROPOSED NEW RELIGIOUS BUILDING & SITE IMPROVEMENTS SITE <br /> AT <br /> 21356 NAGLEE ROAD TRACY (UNINCORPORATED) CALIFORNIA <br /> IMPERVIOUS I PERVIOUS AREAS \` _ _ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - -- - - - - - - - - - - -- - - - <br /> IMPERVIOUS AREAS (SF) PERVIOUS AREAS (SF) WEST LARCH ROAD - <br /> INV6.10 -- - - - - - -- --_ - - - - - - - - - - - - - - - <br /> ROOF AREA 42,935 PERVIO40,234 I - -- - - <br /> - - - -- - - - - - - - - - - - - <br /> ASPHALT PAVEMENT 22,440 PERVIOU44,388 / - <br /> - - --- <br /> HARDSCAPE 20,408 <br /> INV 6.42 - - - _ - 9` - " D P 0.0 5 GR .50 v s io <br /> 0 <br /> _ s. <br /> Old INV Ilk' <br /> TOTAL IMP. AREA 85, 782 TOTAL PER. AREA 84,622 )0 - - - - LARCH RD CL <br /> 2' CMP se''0 FUTURE <br /> o LF-12"S e�6 55' BSL M sL FROG <br /> �, V s6�� CH RD CL <br /> Protect: Gurdwara Sahib Tracy I I - (NOT OFSE I & II, � � �Z ' ",= ' _ l ` I VICINITY MAP <br /> - - NOT TO SCALE <br /> Designer: D. Liguori- BAPC Technical Services Division ry I� OVERFLOW FOR EVENTS) x I <br /> I i L_ <br /> HORSE ' 216' X 93' LEACH FIELD AREA <br /> STAL 0 8. i} , l _ I ! <br /> I I (AREA - 20,000 SF±) � �' <br /> LEGEND <br /> EX BLDG <br /> wI <br /> SUMMARY I I - S ----- ��' <br /> W - 11 <br /> The parking lot for this project is being used as a comprehensive pavement based stormwater management II i IJo _ -12 PROPOSED FG MAJOR CONTOUR <br /> system, designed using the Large Area This infiltration System(LATIS) principle. LATIS systems are Q O l -' F PROPOSED FG MINOR CONTOUR <br /> fundamentally different that conventual systems in that they are highly effective with very low soil infiltration II I ��� z �' �i - - BUILDING SETBACK LINE <br /> rates when designed properly. By limiting the stormwater run-off from adjacent areas to the parking lot to an PHASE <br /> - _�Ex caRr�cE - �H� - API FENCE TO BE REPLACED <br /> approx. 1:1 ratio, one hundred percent of the water from the one hundred year twenty-four-hour storm I I L -! 11 � cn LANDSC <br /> event can be fully captured and infiltrated in just over 26 hours,with zero outflows from the system. _ _ L - E" HIGH WIRE <br /> :.9,48 <br /> EXISTING BUILDING TO BE DEMOLISHED <br /> The accompanying data is based on the tested in-situ soil infiltration rate combined with the high end of the I Q I rfRE <br /> TD IfAC'y ASPHALT <br /> NOAA one hundred year storm range of 3.91'. The infiltration rate used in calculations is the KSAT,which is I I 5 T _---- -- EX. TO _ �IELD,S - _ <br /> the rate of infiltration when the soil is fully saturated.This is the most conservative method of modeling the I ff ESIEX. MAN c C'.". . ..• • : : _ •,• - _- <br /> o. RESIDENCE . . _ \D S <br /> ' -- !� <br /> . • . . . •'��I CONCRETE <br /> I <br /> system performance and as such,the system performance will likely exceed the model in most cases. I �tfC <br /> . ,•. . .•. . . . . <br /> 91 L <br /> When installed properly the pavement will perform(in regard to surface infiltration)at a high level with I :•,•,•. . . . . . . . . . . . . . . . . • . . 9�5 �� LJ / ��� 1�,, �� PERVIOUS CONCRETE <br /> J <br /> minimal maintenance.Surface infiltration rates should be tested before the pavement goes into service and {'•'•'•'•'•'•'•-•••••-•-•'•••:•:•:•:•: :':'r ' 10,000 GAL BATTERY FROM B TH DEVELOPMENT <br /> I - <br /> periodically thereafter. Surface infiltration rates shall be an average minimum of 400" per hour as tested .�:':':':' :':':':' :'•'•'•'•'•'• •'a; SEPTIC TANK (JENSEN 1i RESTROO �� <br /> . . . . . PHASE 11 DEVELO <br /> o ASTM C1701.The rate and quantity of sediment loading on the pavement is expected to me I _ <br /> . r <br /> according t . . . . . . . . . . . 1 5 L I f � <br /> ant be cleaned once per year in the fall using a vacuum truck. po Gq <br /> r It is recommended the pavement P Y I I • • • • • . • • • . .,•,•,•. . . . .. . ::f: 'G♦2EASE \ W } <br /> minimal therefore L . .'. :': .'. : :': . . . . . TERCEPTOR <br /> ::::::::::: <br /> If sediment or debris from an unexpected source is introduced to the pavement surface more frequent I I GATe. ro lN!, T z OO PROPOSED LANDSCAPING <br /> I I: RESERVE LEACH FIELD AREA _ <br /> cleaning may be-be required. I v <br /> . . . . . . . . . . . . . . . . . . . . . . . <br /> I.X� <br /> . . . . . . I:� � � GUEST ' <br /> -- � 0M �� <br /> --- --- <br /> I w <br /> ' KI < a � <br /> Pervious concrete ° -..-...•.,.•.•.,._.,. (AREA 21,000 SF-) .,. .. .•.-.•.•.•. . . . . �:�: 1 /I - 11.2 <br /> y <br /> 6 in Run date 3/4/2019 I I o . . . . . . . . . . . . . . . . . ....' . . . . :'.. e'= �- <br /> Thickness L.'. w .�. V <br /> Surface area 84,621 sgft I I d. I .,. . _ ! L X6.0, <br /> 2 <br /> p q" Storm Type 1A to <br /> :: <br /> I . . . . . . ..':' . . . . . . ❑ <br /> Porosity I I o . . . . . . . . . . . . . . . . . . . . . . ..'.-.•. . . . . . . o I r LOBBY I <br /> 24-hr Precipitation 3.96 - . . . . . . . . . . .� . . . . . . . . . • • P <br /> Gravel baseF- RASE <br /> Thickness 6 1n Location Trac CA I I IZ I - y ��I <br /> Porosity o I L'_ - _•_ - -- - --- - - - -- :1.. 1 ,� �. .._..�.-.... .._-.-.- ._•J ' ' . �'` -_I J <br /> 4U /" Rain Event 100 I <br /> . . ! L . _ '51:: Q <br /> S 89.20' " IN 6 PHASE I RELIGIOUS HALL w <br /> Ponding capacity (NA) n DINING HALL CLO ETS ,,. �. <br /> PIF L11 <br /> Desian atm - - " ' <br /> Exfiltration rate-KSAT 0.32 Whir Tar et CN 0 • � _ <br /> T F, <br /> Allowable runoff 0 <br /> 11.1' <br /> Impervious surface ---_--__----.-- ---_-._-.-. ---_.-.. " +, „ COdI poi ENTRY'' COVERED WAY ECT DATA <br /> 85.782 sgft r- .. 'd_ m:_. c ®: . ® o..i" <br /> Surface area Ra iA <br /> ----------------- Ponding i < „" ° . rrt �• (o AREA: 8.493 ACRES <br /> '• •, PROJECT <br /> ---------- <br /> (Intermediate results I g _ 1 <br /> Infiltration Zone 'io. TOTAL SITE <br /> Total drained surface area 170,403 6gfI rates PROPOSED SITE PLAN <br /> h ti <br /> Storage rapacity,pervious concrete 5,923 cuff Pervious , <br /> Storage capacity,gravel base 18824 tuft SCALE: 1"=40' _ - „ '{ PROPOSED PHASE I AREA BUILDING SPACES: <br /> Concrete <br /> Total stormwater storage 22,848 tuft / # { { <br /> �ft�� 3 # � � FIRST FLOOR: <br /> cuh <br /> Total preclp volume 56,233 cuh - {{ SS � - <br /> 3-day exfiltration volume 56.233 tuft Gravel ti SSS <br /> s PROPOSED AREA FOR „A-3" OCCUPANCY 8,079 SQ. FT. <br /> Total runoff(overflow) 0 cuh base � PROPOSED AREA FOR "A 2" OCCUPANCY 8,383 SQ. FT. <br /> 26.1' <br /> Water stored aper 3-days 0 cuh o �, T ti rt i � � PROPOSED AREA FOR "R-3" OCCUPANCY 648 SQ. FT. <br /> Water balance error 0 cult <br /> GR 11.50 PROPOSED AREA FOR "B" OCCUPANCY 645 SQ, FT. <br /> Controlling 41NV 16.SOIN -"J -- ❑ o ❑ j �?1 st PROPOSED AREA FOR "S1" OCCUPANCY 1,017 SQ. FT. <br /> �L <br /> m o r exfiltravon Boil 6- INV 10.0 � 11 141,0 t��� _ �` ;' i PROPOSED AREA FOR "S2 OCCUPANCY 126 SQ. FT <br /> �Su mary f results _ <br /> Avail runoff(72 hours) - l0 rate subbase -. <br /> Estimate { <br /> Mable storage used 5s % 1 !� <br /> Available storage after 24 hr 6p °i" - -- �I IA - ,s� ., TOTAL BUILDING FOOTPRINT AREA 27,185 SQ. FT. <br /> Available storage after 72 hours 100 % O �I I� i3 ' <br /> ( -- <br /> Stage after 5 days 100 in ---"- <br /> Additional time to drain completely hr - � PARKING SPACES PROVIDED: <br /> - �I 1p - � <br /> - 1 f REGULAR PARKING 250 <br /> ill 11 Illi 6 <br /> ad stormT a lA "ora8e TOTAL ACCESSIBLE PARKING <br /> ��- - - 1 ' MENT �° , f 3 ;f TOTAL VAN ACCESSIBLE PARKING 2 <br /> Location 21356 Na lee Max Water Level L- \ CO. ' PAVE �- <br /> Location Tracy CA 24-hr precl in 3.91 Available(cuh) <br /> 12" �� <br /> Soil Infiltration oaz"/hr storm Event loo r 22,848 TOTAL PARKING STALLS PROVIDED 258 <br /> 26.1' 2 26.2' C r 26.1' 11 <br /> Thr Precl in V ery cuh V Im ery tuft Sum inti V in cult Max Incr V exfll cuh Storage state cuh Incr vol runoff tuft %Store a used Water level in �'- <br /> 0 0.0 l `.,, �� <br /> 0 o.a0 0 0 --����_.__ 7 i 2 1:_ Il - - <br /> 0 0.oe 864 s7z 1136 1136 0 0 o ao `> I�Ir 18.0` i.. - .,,- II - RESERVED FUTURE PARKING STALLS 73 <br /> z o.lz 546 esa 1704 vo4 0 0 0 0.0 ( ��- � TOTAL PARKING INCLUDING FUTURE STALLS 331 <br /> 3 0.13 917 929 1846 1846 0 0 0 0.0 { � - � �! <br /> 4 0.13 917 929 1846 1846 0 0 0 0.0 T 1 <br /> 0.16 1128 144 znz zzs7 1s a 0 o.a r $ II _- m L, BICYCLE PARKING SPACES: <br /> tl <br /> s 0.z <br /> 6 0.20 1410 1430 2540 2257 599 0 3 <br /> �JIIU 'I <br /> 7 0.25 1763 1787 3550 2257 1892 0 8 0.7 _ _ ( �� L �� it - �! BICYCLE PARKING 12 <br /> 8 0.62 4372 4432 8804 2257 8440 0 37 3.0 y Zt• �" <br /> 9 a 2680 2716 5396 2257 1]580 0 51 4.7 { `. � ��. `� PHASE II NOTES: <br /> �� � <br /> s , <br /> II <br /> 10 0.23 1622 1644 3266 2257 12589 1 55 4.6 ..� � C <br /> 0.19 1340 1358 2695 2257 13031 U 57 4.6 --�� 1€ �' l IF- r ' �i <br /> it 57 4.6 i L-1 _ l <br /> lz 0.16 1128 1144 2272 zzs7 13046 a W ISI E FONS CONSTRUCTION H THEHBU BUILDINGS,GS. PLAN WILL INCLUDE <br /> I t I� I � t - - !_ a PHASE II SITE <br /> 13 0�1s 1088 1072 2130 2257 12924 0 s7 4.6 - W { ONLY THE ALL LANDSCAPING L C TR F I N A AP WILL <br /> 14 0,14 987 1001 1986 zzs7 12681 o ss 4s 26'1 -�' -- \;I I -" ' --- <br /> IIP - BE CONSTRUCTED DURING PHASE I. PHASE II IS PLANNED TO BEGIN <br /> 15 0.13 917 929 1846 2257 12240 0 54 4.3 �� II!) �!� •�, �- - II <br /> 16 0.13 917 929 leas 2257 13830 1 sz 4.z z{ , F...a,. t I I Q Q I III 3 4 YEARS AFTER PHASE I. STORMWATER CONTROL AND SEPTIC <br /> in <br /> v o.la 546 858 vo4 zzs7 11277 o as 4.0 _ O _ x� SYSTEM HAVE BEEN DESIGNED TO ACCOMODATE FUTURE PHASE <br /> �� r 2 ---t I � . �� - U - ' - <br /> 18 0.11 276 756 1762 2257 11283 0 46 3.a - " l 911 + DEVELOPMENT. THE RESERVED FUTURE PARKING LOT IS NOT <br /> 19 0.11 776 786 1562 2257 9888 o a3 3s -1 to INCLUDED WITH PHASE II. <br /> 20 0.10 705 715 1420 2257 9052 0 40 3.2 �) <` �� I N L_� y� �� --.- <br /> 21 0.10 705 715 1420 2257 8215 0 36 2.9 26.1' -N <br /> zz 0,09 638 G43 ire zzs7 2737 0 32 2.6 PHASE II AREA FOR CLASSROOMS <br /> z3 a.os 383 387 no 2257 5690 o zs z.o I ( - -- ----il - 1 ` AND SUPPORTING FUNCTIONS : 13,911 SQ. FT. <br /> 24 0.03 212 214 426 2257 3860 0 17 1.4 _.. - II- ll I l 9 � { --- <br /> 25 0.02 141 143 284 2257 1887 0 8 0.7 <br /> 284 2171 0 0 0 0.0 _ t <br /> 26 0.02 141 193 --- G' I l <br /> 27 0.o1 71 71 142 142 0 0 0 0.0 - I!!� - -- <br /> 18 0' <br /> 28 0 0 0 0 0 0 0 0 0.o W 20.0 Ill�la / III tis?# <br /> 0.o' t j <br /> __L6.o i III) n I C- <br /> - <br /> f 26.0' <br /> I <br /> "s <br /> - I <br /> 1 �--I 26.2 - <br /> _ _ �1 I_ 18.0': <br /> �� <br /> - <br /> 01 <br /> ee <br /> �, <br /> r 9.5 <br /> o <br /> 11;0� <br /> - I <br /> 2 - 12' 8- <br /> --_ <br /> -`554.691 <br /> 8 0 00 <br /> 19- <br /> IV <br /> GRAPHIC SCALE <br /> 40 0 20 40 60 160 <br /> AUTO PLAZA-DR-1VE , <br /> ( IN FEET ) <br /> 1 inch = 40 ft. <br /> SHEET NO. <br /> RELEASE STATUS: DATE REVISIONS: DATE: O�OFESS1 <br /> COPYRIGHT NOTE: � � <br /> STERLINGCOPYRIGHT © STERLING CONSULTANTS ALL RIGHTS RESERVED. NO PART of THIS GURDWARA SAHIB TRACY 0 p �C 51620 SITE PLAN CDRAWING MAY BE REPRODUCED BY PHOTOCOPYING, RECORDING OR BY ANY 2 1 3 5 6 N A G L E E R O A D I O <br /> CONSULTANTS OTHER MEANS, OR STORED, PROCESSED OR TRANSMITTED IN OR BY ANY O Q ��9r <br /> COMPUTER OR OTHER SYSTEMS WITHOUT THE PRIOR WRITTEN PERMISSION OF TRACY C A O For CA�v� OF 1 SHEETS <br /> 46560 FREMONT BOULEVARD, UNIT NO. 205 STERLING CONSULTANTS. COPIES OF TTS DRAWING WITHOUT AN ORIGINAL <br /> SIGNATURE AND STAMP ARE NOT VALID. O © SCALE: AS NOTED PROJECT NO : 14-146 <br /> FREMONT, CA 94538 <br /> lsterbrigconsultants@gmail.com PHONE: 510.344.8955 <br />