Laserfiche WebLink
�Ir APPLICATION - SITE APPROVAL <br /> �` \\ SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> o- <br /> FILE NUMBER: SA- <br /> Existing Roads <br /> Road/Street Name R.O.W.Width I Pavement Width Curb/Gutter Sidewalks <br /> Navone Rd 60 160 Yes 0 No❑ Yes❑ No 0 <br /> Hardaway 60 140 Yes 0 No❑ Yes ❑ Noll <br /> Surface Transportation Assistance Act STAR trucks <br /> Will STAA type trucks,over California Legal length,be used as part of the proposed operation? <br /> Yes❑ (if yes,the applicant must provide a letter requesting designation of the proposed facility as an STAA terminal.) <br /> No 0 <br /> ENVIRONMENTAL INFORMATION <br /> USE ADDITIONAL PAPER, IF NECESSARY) <br /> Water,Drainage and Flooding <br /> Describe any areas subject to flooding(include flood depths and flood panel map number): <br /> None <br /> Describe the current depth of the ground water and depth to potable water: <br /> Unknown <br /> Describe any existing drainage courses or eroded areas on or near the project site(e.g. rivers,creeks,swales or drainage ditches): <br /> Existing 200-ft x 50-ft x 5-ft deep retention basin on the southern portion of the property. <br /> Land, Land Use and Biota <br /> Describe the site's topography(e.g. land forms,slopes,etc.): <br /> The existing site has a relatively shallow slope that directs runoff towards the south where the detention basin is located. <br /> Describe agricultural land that will be lost as a result of the project(type of crops,acres,quality of soil, etc.): <br /> Roughly 1.1 acres of land will be used for the new storage building and associated pavements.The detention area will also double in size to <br /> accommodate the increase in storm drain runoff. <br /> Describe any wildlife habitat on-site and species that are of may be present: <br /> None were found. <br /> Describe any vegetation on-site by type and extent: <br /> The existing open land area is made up of mainly tall grass and weeds. Several trees are spread out along the frontage and a handful <br /> of trees currently exist near the detention basin. A small handful of small trees may be removed or relocated for this project. <br /> Air Quality <br /> Describe air pollutants that may result from the project(e.g.construction related dust,vehicle trips per day,fire places, incinerators, <br /> etc.): <br /> Minimal construction related vehicular/equipment traffic <br /> FADEVSVC\Planning Application Forms\Site Approval.(Revised 02-03-10) Page 4 of 9 <br />