My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0010931
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVONE
>
3601
>
2600 - Land Use Program
>
PA-1600122
>
SU0010931
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:34:51 AM
Creation date
9/8/2019 1:01:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0010931
PE
2631
FACILITY_NAME
PA-1600122
STREET_NUMBER
3601
Direction
N
STREET_NAME
NAVONE
STREET_TYPE
RD
City
STOCKTON
Zip
95215-
APN
10129008
ENTERED_DATE
6/6/2016 12:00:00 AM
SITE_LOCATION
3601 N NAVONE RD
RECEIVED_DATE
6/6/2016 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\NAVONE\3601\PA-1600122\SU0010931\APPL.PDF \MIGRATIONS\N\NAVONE\3601\PA-1600122\SU0010931\CDD OK.PDF \MIGRATIONS\N\NAVONE\3601\PA-1600122\SU0010931\EHD COND.PDF \MIGRATIONS\N\NAVONE\3601\PA-1600122\SU0010931\MISC.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
w , <br /> SITE APPROVAL <br /> �• y SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> 1810 E. HAZELTON AVENUE, STOCKTON CA 95205 <br /> BUSINESS PHONE: (209) 468-3121 <br /> Business Hours: 8:00 a.m.to 5:00 p.m. (Monday through Friday) <br /> APPLICATION PROCESSING STEPS <br /> STEP 1 CHECK WITH STAFF- Development Services Staff will explain the requirements and procedures to you. <br /> STEP 2 SUBMIT YOUR APPLICATION -When you apply,file all of the following: <br /> • FEE The staff will let you know the current cost of filing an application. Make checks payable to the San Joaquin <br /> County Treasurer. <br /> • FORM Seven(7)copies of the completed application information forms(attached)which all owners must sign. <br /> • SITE PLAN Seven(7)copies of a folded Site Plan(see attached)and two(2)copies of a legible 8-1/2"x 11"site plan. <br /> • HAZARDOUS One copy of a completed Hazardous Materials Disclosure Survey form(a copy of the form is attached). <br /> MATERIALS <br /> DEED One copy of the recorded deed(s)of the property. <br /> • SERVICES If your project requires connection to public facilities,you must submit a'will-serve"letter from the appropriate <br /> water,sewer and drainage entities at the time of filing. This letter must include a statement from the agency <br /> that they will serve the proposed development,and has,or will have,the capacity to provide such service. <br /> APPLICATION Staff will check your application. If anything is missing,you will be notified in writing. The applicant will be <br /> COMPLETE sent a postcard once the application has been determined complete. (Your application cannot be processed <br /> until it is complete.) <br /> STEP 3 APPLICATION PROCESSING <br /> • CEQA The County will decide if the proposal will have an adverse effect on the environment. if there are no adverse <br /> effects,the application will be processed. If there are potential adverse effects,further environmental review <br /> will be required. Projects that have the potential to adversely affect the environment will require the <br /> preparation of an E.I.R. This may extend the processing time. <br /> • REFERRALS Staff will refer the application to any County departments,other agencies and surrounding property owners <br /> AND ACTION affected by your proposal. At the end of a review and comment period the staff will approve your application if <br /> they can make required findings. If the staff cannot make the required findings,the application will be denied. <br /> Typically action will be taken on the project within 7-8 weeks. <br /> • FINAL ACTION The action of the staff can be appealed to the Planning Commission. The staff's action is final unless <br /> appealed. For further information on the length of the appeal period,contact the staff. <br /> STEP 4 CONDITIONS AND ADDITIONAL PERMITS <br /> • CONDITIONS The staff will send you the final action and if it is approval it will list conditions,by department,that must be met <br /> before you can start project. <br /> • IMPROVEMENT In addition to the Site Plan,an Improvement Plan is frequently required as a condition of approval. This is an <br /> PLANS engineered plan showing drainage, grading,frontage improvements,access,on-and off-site service and utility <br /> facilities,landscaping and circulation/parking details. <br /> • DRIVEWAY Driveway Permits must be acquired from the Public Works Department for any work performed within the <br /> PERMITS road right of way. If the project fronts on a state highway these permits are obtained from Caltrans. <br /> • SANITATION& Projects that will utilize new on-site sanitation disposal and/or on-site wells, must get permits from the <br /> WELL PERMITS Environmental Health Division. <br /> • BUSINESS If the project involves a business,a Business License must be approved prior to starting operation. Business <br /> LICENSES License applications can be processed concurrently with the Site Approval application. <br /> • BUILDING If the project involves construction a building permit must be approved prior to commencement of work. <br /> PERMITS <br /> • OTHER Frequently other local,state and/or federal agencies will require permits prior to new uses being established <br /> PERMITS (e.g.Air Pollution Control District, Regional Water Quality Control Board or the Sheriff's Office). The <br /> Community Development Department will identify additional permits we are aware of that may be required for <br /> our project. <br /> FA)EVSVMPlanning Application Forms\Site Approval.(Revised 02-03-10) Page 1 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.