My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0008957
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVONE
>
6880
>
2600 - Land Use Program
>
PA-1100207
>
SU0008957
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:33:46 AM
Creation date
9/8/2019 1:01:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0008957
PE
2631
FACILITY_NAME
PA-1100207
STREET_NUMBER
6880
Direction
E
STREET_NAME
NAVONE
STREET_TYPE
RD
City
STOCKTON
APN
10112031
ENTERED_DATE
11/7/2011 12:00:00 AM
SITE_LOCATION
6880 E NAVONE RD
RECEIVED_DATE
11/7/2011 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\NAVONE\6880\PA-1100207\SU0008957\APPL.PDF \MIGRATIONS\N\NAVONE\6880\PA-1100207\SU0008957\CDD OK.PDF \MIGRATIONS\N\NAVONE\6880\PA-1100207\SU0008957\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
John L. Funderburg -2- <br /> Community Development Department <br /> PA-1100207(SA) <br /> 2. The Regional Transportation Impact Fee shall be required for this development. The fee is due and payable at <br /> the time of building permit application for each phase of the project.The fee will be based on the current <br /> schedule at the time of payment. (Resolution R-06-38) <br /> 3. The Water Supply Facilities Impact Mitigation Fee shall be required for this development. The fee is due and <br /> payable prior to issuance of the building permit for each phase of the project. The fee shall be automatically <br /> increased on January I of each year through the year 2015 at the rate of 4.55 percent.The fee will be based on <br /> the current schedule at the time of payment. (Development Title Section 9-818.4 and Resolutions R-91-327, <br /> R-94-185 and R-97-5) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit for each phase of the <br /> project. <br /> 5. Verification shall be obtained from the Solid Waste Division(468-3066)that this development has met the <br /> requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon submittal <br /> of verification for each phase of the project. <br /> 6. The developer shall meet the requirements of San Joaquin County Development Standards to prevent the <br /> increased runoff release rate of storm water from discharging onto other properties and to prevent offsite <br /> sediment transport for each phase of the project. (Development Title Section 9-1135) <br /> 7. Prepare and implement a Storm Water Pollution Prevention Plan(SWPPP)meeting the requirements of the <br /> State Water Resources Control Board(SWRCB).Applicant shall file a Notice of Intent(NOI)with the <br /> SWRCB and comply with the State"General Permit for Storm Water Discharges Associated with <br /> Construction Activity".The Waste Discharge Identification Number(WDID), issued by SWRCB, shall be <br /> submitted to Public Works for file. Permit Registration Documents(PRD)shall be filed with the SWRCB. A <br /> copy of the approved SWPPP and all required records,updates,test results and inspection reports shall be <br /> maintained on the construction site and be available for review upon request. <br /> Informational Notes: <br /> (i.) This property is subject to the requirements of San Joaquin Comity Mosquito&Vector Control District(209- <br /> 982-4675)and the California Health and Safety Code for the prevention of mosquitoes.Best Management <br /> Practices(BMP)guidelines for stormwater devices,ponds and wetlands are available. <br /> (ii.) All fitture building permits for projects located within a Special Flood Hazard Area at the time of permit <br /> issuance shall meet the San Joaquin County flood hazard reduction requirements(Title 9,Chapter 9-1605) <br /> and all requirements of the State of California(CCR Title 23)that are in force at the time of permit issuance. <br /> As an example,these requirements may include raising the finish floor elevation one foot above the expected <br /> flood level and/or using flood resistant materials. <br /> AC:DS <br /> IISjPsegmt. gtsliareslDerSenicesIDPu6Sen-ICO.ifA!&Y7SLSAtrR 20111Pd-1100107(Olive Promssing FadligM'mwte Rd)IPA-1100207.doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.