Laserfiche WebLink
• Section 6.1: The distances to the percolation test holes are indicated on the attached site <br /> map. <br /> Section 6.3: Twelve inches of water were used to presoak the test holes. <br /> • Section 6.4: After the 24-hour soak period, the test holes were found to be intact and dry. <br /> • Section 6.8: The size and layout of leach fields should follow EHD guidelines. New <br /> leach fields should be located where satisfactory percolation tests were conducted. <br /> Thank you for your continued interest in our work. <br /> Sincerely, <br /> Abigail cco $.A <br /> Environmental Specialist David Welch, M.Sc., C.E.G., C.H.G. <br /> Environmental Department Manager <br /> CC: Mr. Armando Huerta <br /> Armando Huerta Construction <br /> 11931 Norman Avenue <br /> Stockton, California 95215 <br /> attachment <br /> pE RSO <br /> i <br /> > r <br /> Z r <br /> O .� <br />