My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0001237 SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NORTH RIPON
>
18404
>
2600 - Land Use Program
>
LA-00-57
>
SU0001237 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:28:33 AM
Creation date
9/8/2019 1:04:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0001237
PE
2690
FACILITY_NAME
LA-00-57
STREET_NUMBER
18404
Direction
S
STREET_NAME
NORTH RIPON
STREET_TYPE
RD
City
RIPON
APN
24504003
ENTERED_DATE
10/18/2001 12:00:00 AM
SITE_LOCATION
18404 S NORTH RIPON RD
RECEIVED_DATE
7/24/2000 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\NORTH RIPON\18404\LA-00-57\SU0001237\NL STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FFandpregsaturated <br /> COLATION TEST RESULTS <br /> ion tests were conducted on October 13 and 16 under U.S.E.P.A. and San Joaquin <br /> ironmental Health guidelines. Each test boring was prepared the day before testing <br /> .. by twice filling the entire depth of the test boring with water. There was noter after the 24-hr pre-saturation period. Since the soil type at typical leachline depth <br /> of 40 inches is a silty sand, the test period was approximately two hours in duration due to the <br /> length of time to travel to each test boring. Parcels 1, 2, 3, 4 and 8 were perc tested on the 131 <br /> and Parcels 5, 6, 7, 9, 10 and 11 were perc tested on the 16'. This was done since the distance <br /> was too great between the Parcels to attempt to test them all in one day. <br /> As indicated on the attached FIELD PERCOLATION TESTING REPORTS, the perc rates for <br /> all 11 Parcels are less than 10 minutes per inch and vary between 2.7 and 9.6 min/in. These rates <br /> can be considered rapid and illustrate the porosity of the sandy soil. Almost all of the tests <br /> exhibited a slowdown in the perc rate over time as soil saturation increased. Test results are <br /> summarized below: <br /> PERCOLATION TEST RESULTS <br /> PARCEL No PERC RATE IN MIN/INCH PARCEL No PERC RATE IN MIN/INCH <br /> Parcel 1 4.6 min/in Parcel 7 2.7 min/in <br /> Parcel 2 4.9 min/in Parcel 8 3.5 min/in <br /> Parcel 3 8.5 min/in Parcel 9 3.8 min/in <br /> Parcel 4 9.6 min/in Parcel 10 2.8 min/in <br /> Parcel 5 3.9 min/in Parcel 11 6.9 min/in <br /> Parcel 6 6.2 min/in <br /> - III. NITRATE LOADING STUDY RESULTS <br /> A. GROUNDWATER INFORMATION <br /> 1. ESTIMATED GROUNDWATER GRADIENT AND VELOCITY <br /> As referenced above, the static water level under the center of the project is located at 28 ft below <br /> grade according to the Lines of Equal Depth Map published by the San Joaquin County Flood <br /> Control District. The Lines of Equal Elevation map illustrate the groundwater flow to be in a <br /> north-northeast direction. From this map, it is apparent the gradient is very gradual as the flow <br /> travels west-northwest and north-northeast, and then becomes comparatively steep southeast of <br /> the subject site. Additionally,the groundwater direction has been determined by triangulation <br /> and has been plotted on the Lines of Equal Elevation Map. <br /> 5 <br /> _ 'Va!!ey Ag Research <br />
The URL can be used to link to this page
Your browser does not support the video tag.