Laserfiche WebLink
CONDITIONS OF APPROVAL <br /> RUBY WILLIAMS <br /> MS-91-62 <br /> Unless otherwise specified, all Conditions of Approval shall be <br /> complied with prior to the approval of the Parcel Map. <br /> 1. DEPARTMENT OF PUBLIC WORKS: <br /> Conditions of Approval: <br /> a . Dedication to result in a 30-foot wide right-of-way from <br /> the centerline of North Ripon Road to the property line <br /> shall be required across the frontage of Parcel 2 . <br /> b. The frontage improvements for North Ripon Road across <br /> Parcel 2 shall be constructed in conformance with the <br /> standards for one-half of a 60-foot right-of-way farm or <br /> estate subdivision street. The constructions of the <br /> frontage improvements will be deferred, upon execution <br /> by the owner of a Deferred Frontage Improvement <br /> Agreement, prior to approval of the Parcel Map. (A <br /> $250. 00 fee currently is required for processing per <br /> Planning Title Section 9-10502 in addition to a copy of <br /> the Grant Deed, legal description of Parcel 2 , and an <br /> estimate. The estimate and legal description shall be <br /> prepared by a Registered Civil Engineer with a typical <br /> section drawing on a form to be supplied by the Public <br /> Works Department and submitted to the Public Works <br /> Department for approval. As an option the Department of <br /> Public Works will prepare the drawing with estimate for <br /> a n additional fee of $100. 00. ) <br /> C. Requirements for construction of improvements shall be <br /> noticed by a statement on the Parcel Map. <br /> d. All easements of record shall be shown on the Parcel Map. <br /> ORDINANCE REQUIREMENTS: <br /> The Ordinance Requirements listed below have been identified as <br /> pertinent to this project. Other Ordinance Requirements may also <br /> apply. Ordinance Requirements cannot be modified. <br /> e. A Parcel Map is required. <br /> f. The Traffic Impact Mitigation Fee will be required for <br /> this subdivision. The fee is due and payable at the time <br /> of building permit application. (The fee currently is <br />