Chandler Martin <br /> COMMUNITY DEVELOPMENT <br /> PA-04-590 (SA) <br /> 3. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 4. Drainage from each parcel shall be retained on-site by a retention basin (18-inch maximum depth). <br /> Drainage for each parcel shall be calculated by a Registered Civil Engineer or an Architect prior to release <br /> of Building Permit and shall be noticed by a statement on flie Pamel Map. <br /> (Development Title Section 9-1135.9) <br /> NOTE: Any construction activity that results in the disturbance of at least one(1) acre of soil shall require a <br /> State NPDES construction permit. <br /> MRC:SH:ar <br /> P\C0MM6NTS\SA\VR 2004\PA-0400590(revision).wpd <br />