Laserfiche WebLink
Ppul/y Q <br /> v .A P.O.BOX 1810-1B10 E.HAZELTON AVENUE <br /> 3 STOCKTON,CALIFORNIA 95201 <br /> .(209)468-3000 FAX(209)468-2999 <br /> www,sjgov.orglpubworks. <br /> 4. MICHAEL SELLING <br /> DEPUTY DIRECTOR <br /> FRITZ BUCHMAN WcTldns for oar <br /> DEPUTY DIRECTOR <br /> JIM STONE .. Ulll. C 1 LU�J <br /> DEPUTY DIRECTOR <br /> ROGER JANES Sul l .J Paquin County <br /> BUSINESS ADMINISTRATOR COfI1P11unity Development <br /> July 22, 2015 <br /> MEMORANDUM . <br /> TO: John L. Funderburg, Principal Planner <br /> Community Development Department. ¢` <br /> CONTACT PERSON: Corinne King <br /> FROM: Alex Chetley,Engineering Services Manager. <br /> Development Services Division <br /> SUBJECT: PA-1500021-;-A Site Approval-application to construct 4 storage sheds totaling 24,000 square feet <br /> and convert 2 existing warehouse buildings totaling 100;000 square feet to manufacturing; located <br /> on the north side of Kile Road, 200 feet east of Thornton Road, Thornton. (Supervisorial District 4) <br /> PROPERTY OWNER: Universal Forest Products APPLICANT: UFP Thornton <br /> Western Division, Inc. <br /> ADDRESS: 26200 N. Nowell Road, Thornton APN: -001-230-03, 05,40; 20 &21 <br /> INFORMATION: <br /> The site is currently located within a Federal Emergency Management.Agency Designated Flood Hazard Area <br /> i` (designated as Zone AH El 15). The 100-Year Flood Elevation will be approximately 15 feet NAVD 1988. <br /> N.Nowell Road has an existing right-of-way width of 60 feet and a variable planned right-of-way width. <br /> RECOMMENDATIONS: <br /> 1. An encroachment permit shall be required for.all work within road right-of-way. (Note:'Driveway <br /> encroachment permits are for flatwork only—all vertical features, including but not limited to fences, walls, <br /> i private light standards, rocks, landscaping and cobbles are not allowed in the right-of-way.).(Developrnent <br /> Title Sections 9-1145.4 and 9-1145.5) <br /> 2. The applicant shall enter into an agreement to pay an annual road maintenance fee of$1.00 per truckload of <br /> material entering or leaving the site. A fee for preparing the agreement shall be required. The road <br /> maintenance fee is based upon the April 2015 ENR Construction Cost Index of 9,992, and will be adjusted <br /> annually. <br />