Laserfiche WebLink
Pp WN <br /> 'o.� ..0 G COUNTY OF SAN JOAQU I N <br /> 2r 2 EUGENE DELUCCHI <br /> y: < DEPARTMENT OF PUBLIC WORKS CHIEF DEPUTY DIRECTOR <br /> P.O.BOX 1810-1810 E.HAZELTON AVENUE THOMAS R.FLINN <br /> STOCKTON.CALIFORNIA 95201 DEPUTY DIRECTOR <br /> a�P (209)468-3000 y � ��g ! MANUEL LOPEZ <br /> g F O R d DEPUTY DIRECTOR <br /> HENRY M. HIRATA r+ ( RICHARD C.PAYNE <br /> DIRECTOR F 1 j ri .�,? DEPUTY DIRECTOR <br /> August 7 , 1990 <br /> M E M O R A N D U M ` <br /> TO : Tom Walker , Deputy Director <br /> Planning and Building Inspection Departm t <br /> FROM : Thomas M . Gau, Senior Civil Engineer <br /> Public Services Division <br /> SUBJECT : SA-90-61 PRE-APPLICATION for the construction of a can <br /> manufacturing and warehouse facility at an existing cannery . <br /> Located at the S . end of Nowell Road , Thornton . <br /> APPLICANT : Tri Valley Growers APN : 001-230-20 <br /> INFORMATION : <br /> The site is located within a Federal Flood Insurance <br /> Administration Designated Flood Hazard Area . The 100-Year Flood <br /> Elevation will be approximately 13 feet NGVD . <br /> Nowell Road has an existing right-of-way width of 60 feet, and a <br /> planned right-of-way width of 60 feet . <br /> ORDINANCE REQUIREMENTS : <br /> 1 . An Improvement Plan, prepared by a registered Civil <br /> Engineer , showing drainage , driveway access details , on-site <br /> parking, existing and proposed utility services , and grading, <br /> shall be submitted to the Department of Public Works for <br /> approval . Storm drainage shall be retained on-site , or <br /> provisions shall be shown on the Improvement Plan . <br /> 2 . Encroachment permit shall be required for work within road <br /> right-of-way . <br /> 3 . The Traffic Impact Mitigation Fee will be required for this <br /> development . The fee is due and payable at the time of <br /> building permit application . (The fee are $979 . 00 per 1 , 000 <br /> gross square feet of building as "Warehouse" and $771 . 00 per <br /> 1 , 000 gross square feet of building as "Manufacturing" in the <br /> Thornton area . The fee shall be automatically adjusted <br /> annually by the Engineering Construction Cost Index as <br /> published by the Engineering News Record . ) <br /> RECOMMENDED CONDITIONS : <br /> ----NONE---- <br /> c : Manuel Lopez <br /> Deputy Director/Development <br />