Laserfiche WebLink
3] SJCOG , Inc . <br /> low <br /> S J C o G, Inc. <br /> San Joaquin County Multi-Specdes Habitat Conservation dam'Open Space Plan <br /> 555 East Weber Avenue•Stockton,CA 95202• (209)235-0600• FAX(209)235-0438 <br /> SJMSCP HOLD <br /> TO: Local Jurisdiction: Community Development Department, Planning Department, Building <br /> Department Engineering Department. Survey Department,Transportation Department. <br /> Other: <br /> FROM: Laurel Boyd,SJCOG, Inc. <br /> DO NOT AUTHORIZE SITE DISTURBANCE <br /> DO NOT !SSUE A BUILDING PERMIT <br /> DO NOT ISSUE FOR THIS PROJECT <br /> The landownerddeveloper for this site has requested coverage pursuant to the San Joaquin County Multi- <br /> Species Habitat Conservation and Open Space Plan (SJMSCP). in accordance_with that agreement, the <br /> Applicant has agreed to: <br /> 1) SJMSCP Incidental Take Minimization Measures and mitigation requirement: <br /> 1. Incidental Take Nfinimization Measures(ITMMs)will be issued to the project and must be signed by the <br /> project applicant prior to any ground disturbance but no later thansix(6)months from receipt of the ITILMs. <br /> IfJTMMs are not signed within six months,the applicant must reapply for SJMSCP Coverage. Upon receipt <br /> of signed ITMMs from project applicant,SJCOG,Inc.staff will sign the ITMMs. This is the effective date <br /> of the ITMMs. <br /> 2. Under no circumstance shall ground disturbance occur without compliance and satisfaction of the ITMMs. <br /> 3. Upon issuance of fully executed ITMMs and prior to any ground disturbance,the project applicant must: <br /> a. Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project acreage <br /> being covered(the bond should be valid for no longer than a 6 month period);or <br /> b. Pay the appropriate SJMSCP fee for the entirety of the project acreage being covered;or <br /> c. Dedicate land in-lieu of fees,either as conservation easements or fee title;or <br /> d. Purchase approved mitigation bank credits. <br /> 4. Within 6 months from the effective date of the ITMMs or issuanceofa building pemtit,whichever occurs <br /> M'w zi first,the project applicant must: <br /> Pay the upproprlate-SJMSCP for the entirety of the project acreage being covered;or <br /> b. Dedicate land in-lieu of fees,either as conservation easements or fee title;or <br /> c. Purchase approved mitigation bank credits. <br /> srV Failure to satisfy the obligations of the mitigation fee shall subject the bond to be called. <br /> Project Title: PA-1600060 (SA) <br /> Landowner. Stockton Korean Ebenezer Presbyterian Church Applicant: J.C. Wagner&Assoc.. Inc. <br /> Assessor Parcel#s: 086-020-01 <br /> T , R , Section(s): <br /> Local Jurisdiction Contact: Megan Aguirre <br /> The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate <br /> Incidental Take Minimization Measures are properly implemented and monitored and that <br /> appropriate fees are paid in compliance with the SJMSCP. <br />