Laserfiche WebLink
PA-04-253 (GP)Pre-Application <br /> Page 2 of 2 <br /> C. Connection to an approved public water supply system is required (San Joaquin County <br /> Development Title, Section 9-1120.2) <br /> Test well will be required to meet the following: <br /> 1. Water quality tested to meet Title 22, CCR(Safe Drinking Water Act), requirements. <br /> 2. Water quantity tested to show an adequate source. <br /> 3. Results approved by the Environmental Health Department and County Public Works <br /> prior to final approval of improvement plans. <br /> D. The project shall be served by a public water system conforming to the requirements of San <br /> Joaquin County Environmental Health Department and the Department of Public Works. <br /> The system shall provide adequate domestic and fire water supply in conformance to the <br /> requirements of the County fire Warden and the local Fire District. A test well showing that <br /> he production well will meet all applicable standards is required prior to the approval of the <br /> improvements Plans or any work within the site. <br /> NOTE: The Environmental Health Department recommends the proposed well location be <br /> moved to a separate parcel area not adjacent to the storm pond because of concerns <br /> relating to drainage and pollutants. A source water assessment may be required prior to <br /> construction in accordance with the California Health and Safety Code. <br /> E. Construction of individual sewage-disposal-system(s) under permit and inspection by the <br /> Environmental Health Department is required at the time of development based on the <br /> findings of the Soil Suitability/Nitrate Loading Study(San Joaquin County Development <br /> Title, Section 9-1110.3 & 9-1110.4). <br />