My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011847
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
RAMSEY
>
210
>
2600 - Land Use Program
>
PA-1800118
>
SU0011847
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:35:29 AM
Creation date
9/9/2019 8:59:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0011847
PE
2611
FACILITY_NAME
PA-1800118
STREET_NUMBER
210
Direction
W
STREET_NAME
RAMSEY
STREET_TYPE
DR
City
MOUNTAIN HOUSE
Zip
95391-
APN
26202003
ENTERED_DATE
7/2/2018 12:00:00 AM
SITE_LOCATION
210 W RAMSEY DR
RECEIVED_DATE
6/29/2018 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
TSok
Supplemental fields
FilePath
\MIGRATIONS\R\RAMSEY\210\PA-1800118\SU0011847\APPL.PDF \MIGRATIONS\R\RAMSEY\210\PA-1800118\SU0011847\CDD OK.PDF \MIGRATIONS\R\RAMSEY\210\PA-1800118\SU0011847\EHD COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GEOLOGY AND SOILS <br /> 22. Seismic Safety: The applicant shall comply with the applicable provisions of the MHCSD Emergency <br /> Preparedness Plan. <br /> Timing: Inclusion -of a—note on Improvement Plans approved by CDD and MHCSD prior to <br /> approval of Final Maps. [SPII Implementation Measure 6.8.3(1)] <br /> 23. Geotechnical Investigation Recommendations: The applicant shall follow the recommendations of <br /> the Geotechnical Engineering Study, Neighborhood C, Parcel E Mountain House, California, <br /> prepared in February 22, 2018 by ENGEO Inc. <br /> Timing: Inclusion of a note on Improvement Plans approved by CDD and MHCSD prior to <br /> approval of Final Maps, and the incorporation of all recommendations of the geotechnical <br /> engineering study into site preparation and construction of each dwelling prior to approval of <br /> building permits. [SP II Implementation Measure 6.8.3 (2); San Joaquin County Development <br /> Title, Chapter 9-905] <br /> HAZARDS <br /> 24. Hazardous Waste: Handling, use and storage of hazardous chemicals or materials including, but not <br /> limited to, asbestos shall be carried out in compliance with all applicable safety standards and <br /> coordinated County programs. Applicable standards shall be made part of the construction <br /> specifications for contractors.- <br /> Timing: Indusion-of note on Improvement Plans approved by CDD and MHCSD prior to <br /> approval of Final Maps. [SPII Implementation Measure 6.7(1)] <br /> 25. Pre-Construction Safeguards: Prior to any construction,appropriate plans, operating procedures and <br /> safeguards shall be undertaken to insure safety in the area of fuel lines and pipelines, consistent with <br /> the MHCSD Emergency Preparedness Plan (see Emergency Pipelines Safety Pian). [SPII <br /> Implementation Measure 6.8.1 (1)] <br /> BIOLOGICAL RESOURCES <br /> 26. Participation in HCP: The Tentative Map shall comply with the San Joaquin County Multi-Species <br /> Habitat Conservation and Open Space Plan (SJCMSCP), including all required take avoidance and <br /> pre-construction survey requirements[SPII Implementation Measure 7.3.1 (1)] <br /> Timing: Prior to approval of Final Map. <br /> 27. Endangered Species Act: In carrying out the operations of the Tentative Map,the applicant shall take <br /> no action that violates the California Endangered Species Act or the Federal Endangered Species <br /> Act. Compliance with said laws shall be the sole responsibility of the applicant and the applicant <br /> agrees to indemnify, defend and hold the County harmless from and against any claim or action by <br /> affected State agencies, or affected Federal agencies or other third party, as to the project's <br /> compliance with said laws. [SPII Implementation Measure 7.3.1 (2)] <br /> Timing: Improvement plans prior to Final Maps and ongoing. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.