Laserfiche WebLink
improvement measures to further reduce Project related emissions from construction and operation. <br /> A complete list of potential air quality improvement measures can be found online at: <br /> http://www.valleyair.org/cegaconnected/aqimeasures.aspx. <br /> 8. Cleaner Off-Road Construction Equipment - This measure is to utilize off- road construction fleets <br /> that can achieve fleet average emissions equal to or cleaner than the Tier II emission standards. This <br /> can be achieved through any combination of uncontrolled engines and engines complying with Tier <br /> II and above engine standards. <br /> 9. Improve Walkability Design-This measure is to improve design elements to enhance walkability and <br /> connectivity. Improved street network characteristics within a neighborhood include street <br /> accessibility, usually measured in terms of average block size, proportion of four-way intersections, <br /> or number of intersections per square mile. Design is also measured in terms of sidewalk coverage, <br /> building setbacks, street widths, pedestrian crossings, presence of street trees, and a host of other <br /> physical variables that differentiate pedestrian-oriented environments from auto-oriented <br /> environments. <br /> 10. improve Destination Accessibility - This measure is to locate the project in an area with high <br /> accessibility to destinations. Destination accessibility is measured in terms of the number of jobs or <br /> other attractions reachable within a given travel time, which tends to be highest at central locations <br /> and lowest at peripheral ones. The location of the project also increases the potential for pedestrians <br /> to walk and bike to these destinations and therefore reduces the (vehicle miles traveled)VMT. <br /> 11. Increase Transit Accessibility - This measure is to locate the project with high density near transit <br /> which will facilitate the use of transit by people traveling to or from the Project site. The use of transit <br /> results in a mode shift and therefore reduced VMT. A project with aresidential/commercial center <br /> designed around a rail or bus station, is called-a transit-oriented development(TOD). <br /> The project description should include, at a minimum, the following design features: <br /> • A transit station/stop with high-quality, high-frequency bus service located within a 5-10 minute <br /> walk(or roughly%mile from stop to edge of development), and/or; <br /> • A rail station located within a 20 minute walk (or roughly '/2 mile from station to edge of <br /> development); <br /> • Fast, frequent, and reliable transit service connecting to a high percentage of regional <br /> destinations; and <br /> • Neighborhood designed for walking and cycling. <br /> VIII. LAMMERSVILLE UNIFIED SCHOOL DISTRICT(Kirk Nicholas, 209-836-7400) <br /> 1. The developer shall enter into full mitigation agreements with the Lammersville Unified School District <br /> (LUSD). [Master Plan Implementation Measure 5.1.3 (j); Specific Pian 11 Implementation Measure <br /> 5.2.1] <br /> Timing: Condition shall be met prior to approval of the Final Map. <br /> 11 <br />